Skip to content
Hubstake

Cost by county

Construction unit costs in Hidalgo County, TX

Median awarded unit prices for 76 items on public projects in Hidalgo County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Texas › Hidalgo County

ItemPerMedianMiddle halfWinning bidsLatest source document
Biodegradable erosion control logs (remove)linear foot$1.51$1.00 – $2.0147Nov 3, 2026, line 11 ↗
Reflective pavement marking type i (w)8 inch(solid)(100mil)linear foot$1.05$0.88 – $2.4042Nov 3, 2026, line 22 ↗
Reflective pavement marker type ii-a-aeach$7.15$5.00 – $7.9142Nov 3, 2026, line 45 ↗
Biodegradable erosion control logs (install) (12 inch)linear foot$5.80$3.00 – $8.2039Nov 3, 2026, line 10 ↗
Reflective pavement marker type i-ceach$7.15$5.00 – $7.6338Nov 3, 2026, line 44 ↗
Reflective pavement marking type i (w)24 inch(solid)(100mil)linear foot$7.00$5.47 – $12.2636Nov 3, 2026, line 23 ↗
Reflective pavement marking type i (y)6 inch(solid)(100mil)linear foot$0.8$0.617 – $1.2732Nov 3, 2026, line 31 ↗
Reflective pavement marking type i (w)6 inch(solid)(100mil)linear foot$0.715$0.625 – $1.0628Nov 3, 2026, line 29 ↗
Remove small road sign support&assemblyeach$175.00$108.50 – $272.5027Oct 7, 2026, line 53 ↗
Elim ext pm & mrks (24 inch)linear foot$4.01$3.00 – $8.0027Nov 3, 2026, line 47 ↗
Reflective pavement marking type i (w)6 inch(broken)(100mil)linear foot$0.81$0.705 – $1.1526Nov 3, 2026, line 28 ↗
Reflective pavement marking type i (y)6 inch(broken)(100mil)linear foot$0.985$0.772 – $1.3126Nov 3, 2026, line 30 ↗
Elim ext pavement marking & mrks (4 inch)linear foot$0.605$0.5 – $0.97526Oct 2, 2024, line 140 ↗
In small road sign support&assembly tys80(1)sa(t)each$1,025$940.00 – $1,10025Oct 7, 2026, line 50 ↗
In small road sign support&assembly tys80(1)sa(p)each$892.50$812.29 – $988.7524Oct 7, 2026, line 49 ↗
Reflective pavement marker type ii-c-reach$5.70$5.00 – $7.5024Nov 3, 2026, line 46 ↗
Prefab pm type c (w)(word)each$265.00$226.97 – $288.2524Nov 3, 2026, line 38 ↗
Elim ext pm & mrks (4 inch)linear foot$0.475$0.35 – $1.0024Oct 7, 2026, line 69 ↗
Electrical conductor (no.6) barelinear foot$2.10$1.78 – $2.3523Oct 7, 2026, line 45 ↗
Bonding Coursegallon$3.05$3.00 – $6.0023Nov 3, 2026, line 50 ↗
Prefab pm type c (w)(arrow)each$185.00$150.00 – $260.2523Nov 3, 2026, line 36 ↗
Re pm w/ret req type i (y)6 inch(solid)(100mil)linear foot$0.84$0.645 – $1.0623Oct 2, 2024, line 137 ↗
Conduit (pvc) (sch 40) (2 inch)linear foot$14.30$10.00 – $19.1922Oct 7, 2026, line 41 ↗
Vehicle signal section (12 inch)led(yellow)each$288.53$259.75 – $350.6222Oct 6, 2026, line 24 ↗
Electrical conductor (no.6) insulatedlinear foot$2.23$2.00 – $2.4822Oct 7, 2026, line 46 ↗
Ground box type a (122311)w/aproneach$1,109$992.50 – $1,33422Oct 7, 2026, line 47 ↗
Temporary sediment control fence (install)linear foot$4.75$4.00 – $6.9422Sep 2, 2026, line 15 ↗
Temporary sediment control fence (remove)linear foot$1.60$1.00 – $2.0022Sep 2, 2026, line 16 ↗
Vehicle signal section (12 inch)led(red)each$291.46$265.00 – $350.0021Sep 2, 2026, line 87 ↗
Backfill (type a)station$232.00$150.00 – $300.0021Aug 5, 2026, line 9 ↗
Electrical conductor (no.8) barelinear foot$1.81$1.36 – $2.0120Oct 7, 2026, line 43 ↗
Aluminum sign (type a)square foot$29.00$23.85 – $33.3920Oct 6, 2026, line 7 ↗
Reflective pavement marking type i (w)12 inch(solid)(100mil)linear foot$2.00$1.11 – $2.9220Oct 7, 2026, line 58 ↗
Reflective pavement marking type i (y)12 inch(solid)(100mil)linear foot$2.37$2.00 – $4.5820Nov 3, 2026, line 24 ↗
Elim ext pavement marking & mrks (24 inch)linear foot$4.78$4.00 – $5.1220Oct 2, 2024, line 143 ↗
Trf signal cbl (type a)(12 awg)(5 conductor)linear foot$2.81$2.40 – $3.3320Sep 2, 2026, line 93 ↗
Tray cable (4 conductor) (12 awg)linear foot$2.85$2.48 – $3.0819Sep 2, 2026, line 33 ↗
Vehicle signal section (12 inch)led(grn arw)each$285.60$261.50 – $350.4219Sep 2, 2026, line 84 ↗
Vehicle signal section (12 inch)led(yellow arw)each$285.60$261.50 – $350.4119Sep 2, 2026, line 86 ↗
Install hwy trf signal (isolated)each$26,940$23,307 – $35,44918Sep 2, 2026, line 82 ↗
Conduit (pvc) (sch 40) (4 inch)linear foot$26.02$20.49 – $33.5518Sep 2, 2026, line 29 ↗
Preparing right of waystation$1,650$1,256 – $2,37518Oct 7, 2026, line 1 ↗
Wk zn pavement marking sht terminal (tab)type weach$1.22$1.11 – $1.4918Nov 3, 2026, line 18 ↗
Remove str (pipe)linear foot$10.00$8.62 – $16.5018Oct 7, 2026, line 28 ↗
Drill shaft (trf signal pole) (36 in)linear foot$352.50$315.00 – $396.2418Sep 2, 2026, line 9 ↗
Vehicle signal section (12 inch)led(grn)each$285.30$259.75 – $349.5018Sep 2, 2026, line 39 ↗
Vehicle signal section (12 inch)led(red arw)each$285.30$259.75 – $350.1318Sep 2, 2026, line 88 ↗
Riprap (Mow Strip)(4 in)cubic yard$592.50$448.95 – $600.0018Nov 3, 2026, line 5 ↗
Driveway (acp)square yard$50.55$37.25 – $69.0018Oct 7, 2026, line 38 ↗
Metal w-beam guard fence (timber post)linear foot$29.49$28.32 – $31.5317Nov 3, 2026, line 14 ↗
Prime Coat (MC-30)gallon$6.00$5.00 – $7.0017Oct 7, 2026, line 15 ↗
Concrete sidewalk (4 inch)square yard$65.00$51.00 – $73.0017Sep 2, 2026, line 20 ↗
Rc pipe (class iii)(18 in)linear foot$100.00$80.00 – $135.0017Oct 7, 2026, line 23 ↗
Remove traffic signaleach$3,215$2,856 – $3,79017Sep 2, 2026, line 38 ↗
Trf signal cbl (type a)(12 awg)(7 conductor)linear foot$3.06$2.95 – $4.3817Sep 2, 2026, line 48 ↗
Construction Exits (Remove)square yard$7.00$5.00 – $11.0017Oct 7, 2026, line 34 ↗
Driveway (concrete)square yard$97.00$80.00 – $100.0016Aug 6, 2026, line 14 ↗
Cement stabilized backfillcubic yard$80.40$67.50 – $111.2516Aug 5, 2026, line 32 ↗
Ground box type d (162922)w/aproneach$1,432$1,138 – $1,71816Sep 2, 2026, line 35 ↗
Pedestrian detector push button (aps)each$888.60$841.00 – $1,00116Sep 2, 2026, line 97 ↗
Pedestrian detector controller uniteach$3,645$3,438 – $3,79416Sep 2, 2026, line 98 ↗
Pavement surface preparation for marking (6 inch)linear foot$0.125$0.075 – $0.21316Oct 6, 2026, line 21 ↗
Elc srv type t 120/240 000(ns)gs(l)ts(o)each$3,851$3,048 – $4,22016Sep 2, 2026, line 36 ↗
SP Mixes Sp-d Sac-a PG76-22ton$120.00$114.53 – $127.8616Aug 5, 2026, line 26 ↗
Curb ramp (type 1)each$2,500$1,845 – $3,15815Sep 2, 2026, line 22 ↗
Remove str (set)each$300.00$276.00 – $402.0015Aug 5, 2026, line 20 ↗
Remove Metal Beam Guard Fencelinear foot$4.00$3.02 – $6.0015Nov 3, 2026, line 15 ↗
Pedestrian pole assemblyeach$1,420$1,274 – $2,80215Sep 2, 2026, line 96 ↗
Downstream Anchor Terminal Sectioneach$1,515$1,400 – $1,97515May 7, 2026, line 109 ↗
Vehicle lp detector (sawcut)linear foot$13.07$10.90 – $14.7215Nov 3, 2026, line 49 ↗
Guardrail End Treatment (Install)each$3,480$3,240 – $3,55014Nov 3, 2026, line 16 ↗
Wk zn pavement marking sht terminal (tab)type y-2each$1.18$1.03 – $1.4314Nov 3, 2026, line 19 ↗
Pedestrian signal section (led)(countdown)each$677.83$597.78 – $857.0014Sep 2, 2026, line 89 ↗
Cementton$191.50$183.69 – $200.0014Oct 7, 2026, line 12 ↗
Conduit (pvc) (sch 80) (4 inch) (bore)linear foot$43.41$37.60 – $45.0014Sep 2, 2026, line 13 ↗
Pavement surface preparation for marking (24 inch)linear foot$1.00$0.75 – $2.0013Sep 2, 2026, line 79 ↗

Other counties in Texas