| Biodegradable erosion control logs (remove) | linear foot | $1.51 | $1.00 – $2.01 | 47 | Nov 3, 2026, line 11 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | $1.05 | $0.88 – $2.40 | 42 | Nov 3, 2026, line 22 ↗ |
| Reflective pavement marker type ii-a-a | each | $7.15 | $5.00 – $7.91 | 42 | Nov 3, 2026, line 45 ↗ |
| Biodegradable erosion control logs (install) (12 inch) | linear foot | $5.80 | $3.00 – $8.20 | 39 | Nov 3, 2026, line 10 ↗ |
| Reflective pavement marker type i-c | each | $7.15 | $5.00 – $7.63 | 38 | Nov 3, 2026, line 44 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | $7.00 | $5.47 – $12.26 | 36 | Nov 3, 2026, line 23 ↗ |
| Reflective pavement marking type i (y)6 inch(solid)(100mil) | linear foot | $0.8 | $0.617 – $1.27 | 32 | Nov 3, 2026, line 31 ↗ |
| Reflective pavement marking type i (w)6 inch(solid)(100mil) | linear foot | $0.715 | $0.625 – $1.06 | 28 | Nov 3, 2026, line 29 ↗ |
| Remove small road sign support&assembly | each | $175.00 | $108.50 – $272.50 | 27 | Oct 7, 2026, line 53 ↗ |
| Elim ext pm & mrks (24 inch) | linear foot | $4.01 | $3.00 – $8.00 | 27 | Nov 3, 2026, line 47 ↗ |
| Reflective pavement marking type i (w)6 inch(broken)(100mil) | linear foot | $0.81 | $0.705 – $1.15 | 26 | Nov 3, 2026, line 28 ↗ |
| Reflective pavement marking type i (y)6 inch(broken)(100mil) | linear foot | $0.985 | $0.772 – $1.31 | 26 | Nov 3, 2026, line 30 ↗ |
| Elim ext pavement marking & mrks (4 inch) | linear foot | $0.605 | $0.5 – $0.975 | 26 | Oct 2, 2024, line 140 ↗ |
| In small road sign support&assembly tys80(1)sa(t) | each | $1,025 | $940.00 – $1,100 | 25 | Oct 7, 2026, line 50 ↗ |
| In small road sign support&assembly tys80(1)sa(p) | each | $892.50 | $812.29 – $988.75 | 24 | Oct 7, 2026, line 49 ↗ |
| Reflective pavement marker type ii-c-r | each | $5.70 | $5.00 – $7.50 | 24 | Nov 3, 2026, line 46 ↗ |
| Prefab pm type c (w)(word) | each | $265.00 | $226.97 – $288.25 | 24 | Nov 3, 2026, line 38 ↗ |
| Elim ext pm & mrks (4 inch) | linear foot | $0.475 | $0.35 – $1.00 | 24 | Oct 7, 2026, line 69 ↗ |
| Electrical conductor (no.6) bare | linear foot | $2.10 | $1.78 – $2.35 | 23 | Oct 7, 2026, line 45 ↗ |
| Bonding Course | gallon | $3.05 | $3.00 – $6.00 | 23 | Nov 3, 2026, line 50 ↗ |
| Prefab pm type c (w)(arrow) | each | $185.00 | $150.00 – $260.25 | 23 | Nov 3, 2026, line 36 ↗ |
| Re pm w/ret req type i (y)6 inch(solid)(100mil) | linear foot | $0.84 | $0.645 – $1.06 | 23 | Oct 2, 2024, line 137 ↗ |
| Conduit (pvc) (sch 40) (2 inch) | linear foot | $14.30 | $10.00 – $19.19 | 22 | Oct 7, 2026, line 41 ↗ |
| Vehicle signal section (12 inch)led(yellow) | each | $288.53 | $259.75 – $350.62 | 22 | Oct 6, 2026, line 24 ↗ |
| Electrical conductor (no.6) insulated | linear foot | $2.23 | $2.00 – $2.48 | 22 | Oct 7, 2026, line 46 ↗ |
| Ground box type a (122311)w/apron | each | $1,109 | $992.50 – $1,334 | 22 | Oct 7, 2026, line 47 ↗ |
| Temporary sediment control fence (install) | linear foot | $4.75 | $4.00 – $6.94 | 22 | Sep 2, 2026, line 15 ↗ |
| Temporary sediment control fence (remove) | linear foot | $1.60 | $1.00 – $2.00 | 22 | Sep 2, 2026, line 16 ↗ |
| Vehicle signal section (12 inch)led(red) | each | $291.46 | $265.00 – $350.00 | 21 | Sep 2, 2026, line 87 ↗ |
| Backfill (type a) | station | $232.00 | $150.00 – $300.00 | 21 | Aug 5, 2026, line 9 ↗ |
| Electrical conductor (no.8) bare | linear foot | $1.81 | $1.36 – $2.01 | 20 | Oct 7, 2026, line 43 ↗ |
| Aluminum sign (type a) | square foot | $29.00 | $23.85 – $33.39 | 20 | Oct 6, 2026, line 7 ↗ |
| Reflective pavement marking type i (w)12 inch(solid)(100mil) | linear foot | $2.00 | $1.11 – $2.92 | 20 | Oct 7, 2026, line 58 ↗ |
| Reflective pavement marking type i (y)12 inch(solid)(100mil) | linear foot | $2.37 | $2.00 – $4.58 | 20 | Nov 3, 2026, line 24 ↗ |
| Elim ext pavement marking & mrks (24 inch) | linear foot | $4.78 | $4.00 – $5.12 | 20 | Oct 2, 2024, line 143 ↗ |
| Trf signal cbl (type a)(12 awg)(5 conductor) | linear foot | $2.81 | $2.40 – $3.33 | 20 | Sep 2, 2026, line 93 ↗ |
| Tray cable (4 conductor) (12 awg) | linear foot | $2.85 | $2.48 – $3.08 | 19 | Sep 2, 2026, line 33 ↗ |
| Vehicle signal section (12 inch)led(grn arw) | each | $285.60 | $261.50 – $350.42 | 19 | Sep 2, 2026, line 84 ↗ |
| Vehicle signal section (12 inch)led(yellow arw) | each | $285.60 | $261.50 – $350.41 | 19 | Sep 2, 2026, line 86 ↗ |
| Install hwy trf signal (isolated) | each | $26,940 | $23,307 – $35,449 | 18 | Sep 2, 2026, line 82 ↗ |
| Conduit (pvc) (sch 40) (4 inch) | linear foot | $26.02 | $20.49 – $33.55 | 18 | Sep 2, 2026, line 29 ↗ |
| Preparing right of way | station | $1,650 | $1,256 – $2,375 | 18 | Oct 7, 2026, line 1 ↗ |
| Wk zn pavement marking sht terminal (tab)type w | each | $1.22 | $1.11 – $1.49 | 18 | Nov 3, 2026, line 18 ↗ |
| Remove str (pipe) | linear foot | $10.00 | $8.62 – $16.50 | 18 | Oct 7, 2026, line 28 ↗ |
| Drill shaft (trf signal pole) (36 in) | linear foot | $352.50 | $315.00 – $396.24 | 18 | Sep 2, 2026, line 9 ↗ |
| Vehicle signal section (12 inch)led(grn) | each | $285.30 | $259.75 – $349.50 | 18 | Sep 2, 2026, line 39 ↗ |
| Vehicle signal section (12 inch)led(red arw) | each | $285.30 | $259.75 – $350.13 | 18 | Sep 2, 2026, line 88 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | $592.50 | $448.95 – $600.00 | 18 | Nov 3, 2026, line 5 ↗ |
| Driveway (acp) | square yard | $50.55 | $37.25 – $69.00 | 18 | Oct 7, 2026, line 38 ↗ |
| Metal w-beam guard fence (timber post) | linear foot | $29.49 | $28.32 – $31.53 | 17 | Nov 3, 2026, line 14 ↗ |
| Prime Coat (MC-30) | gallon | $6.00 | $5.00 – $7.00 | 17 | Oct 7, 2026, line 15 ↗ |
| Concrete sidewalk (4 inch) | square yard | $65.00 | $51.00 – $73.00 | 17 | Sep 2, 2026, line 20 ↗ |
| Rc pipe (class iii)(18 in) | linear foot | $100.00 | $80.00 – $135.00 | 17 | Oct 7, 2026, line 23 ↗ |
| Remove traffic signal | each | $3,215 | $2,856 – $3,790 | 17 | Sep 2, 2026, line 38 ↗ |
| Trf signal cbl (type a)(12 awg)(7 conductor) | linear foot | $3.06 | $2.95 – $4.38 | 17 | Sep 2, 2026, line 48 ↗ |
| Construction Exits (Remove) | square yard | $7.00 | $5.00 – $11.00 | 17 | Oct 7, 2026, line 34 ↗ |
| Driveway (concrete) | square yard | $97.00 | $80.00 – $100.00 | 16 | Aug 6, 2026, line 14 ↗ |
| Cement stabilized backfill | cubic yard | $80.40 | $67.50 – $111.25 | 16 | Aug 5, 2026, line 32 ↗ |
| Ground box type d (162922)w/apron | each | $1,432 | $1,138 – $1,718 | 16 | Sep 2, 2026, line 35 ↗ |
| Pedestrian detector push button (aps) | each | $888.60 | $841.00 – $1,001 | 16 | Sep 2, 2026, line 97 ↗ |
| Pedestrian detector controller unit | each | $3,645 | $3,438 – $3,794 | 16 | Sep 2, 2026, line 98 ↗ |
| Pavement surface preparation for marking (6 inch) | linear foot | $0.125 | $0.075 – $0.213 | 16 | Oct 6, 2026, line 21 ↗ |
| Elc srv type t 120/240 000(ns)gs(l)ts(o) | each | $3,851 | $3,048 – $4,220 | 16 | Sep 2, 2026, line 36 ↗ |
| SP Mixes Sp-d Sac-a PG76-22 | ton | $120.00 | $114.53 – $127.86 | 16 | Aug 5, 2026, line 26 ↗ |
| Curb ramp (type 1) | each | $2,500 | $1,845 – $3,158 | 15 | Sep 2, 2026, line 22 ↗ |
| Remove str (set) | each | $300.00 | $276.00 – $402.00 | 15 | Aug 5, 2026, line 20 ↗ |
| Remove Metal Beam Guard Fence | linear foot | $4.00 | $3.02 – $6.00 | 15 | Nov 3, 2026, line 15 ↗ |
| Pedestrian pole assembly | each | $1,420 | $1,274 – $2,802 | 15 | Sep 2, 2026, line 96 ↗ |
| Downstream Anchor Terminal Section | each | $1,515 | $1,400 – $1,975 | 15 | May 7, 2026, line 109 ↗ |
| Vehicle lp detector (sawcut) | linear foot | $13.07 | $10.90 – $14.72 | 15 | Nov 3, 2026, line 49 ↗ |
| Guardrail End Treatment (Install) | each | $3,480 | $3,240 – $3,550 | 14 | Nov 3, 2026, line 16 ↗ |
| Wk zn pavement marking sht terminal (tab)type y-2 | each | $1.18 | $1.03 – $1.43 | 14 | Nov 3, 2026, line 19 ↗ |
| Pedestrian signal section (led)(countdown) | each | $677.83 | $597.78 – $857.00 | 14 | Sep 2, 2026, line 89 ↗ |
| Cement | ton | $191.50 | $183.69 – $200.00 | 14 | Oct 7, 2026, line 12 ↗ |
| Conduit (pvc) (sch 80) (4 inch) (bore) | linear foot | $43.41 | $37.60 – $45.00 | 14 | Sep 2, 2026, line 13 ↗ |
| Pavement surface preparation for marking (24 inch) | linear foot | $1.00 | $0.75 – $2.00 | 13 | Sep 2, 2026, line 79 ↗ |