| Reflective pavement marker type ii-c-r | each | $5.00 | $4.67 – $6.62 | 31 | Nov 4, 2026, line 288 ↗ |
| Biodegradable erosion control logs (remove) | linear foot | $1.00 | $1.00 – $1.80 | 29 | Nov 4, 2026, line 138 ↗ |
| Portable Changeable Message Sign | each | $15,201 | $5,500 – $20,000 | 29 | Nov 4, 2026, line 127 ↗ |
| Pavement surface preparation for marking (6 inch) | linear foot | $0.18 | $0.08 – $0.31 | 27 | Nov 4, 2026, line 293 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | $8.60 | $8.00 – $10.24 | 26 | Nov 4, 2026, line 264 ↗ |
| Reflective pavement marking type i (w)6 inch(solid)(100mil) | linear foot | $0.7 | $0.6 – $1.05 | 25 | Nov 4, 2026, line 283 ↗ |
| Reflective pavement marking type i (y)6 inch(solid)(100mil) | linear foot | $0.7 | $0.6 – $1.05 | 25 | Nov 4, 2026, line 284 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | $1.17 | $1.00 – $1.76 | 24 | Nov 4, 2026, line 262 ↗ |
| Reflective pavement marking type i (w)(arrow)(100mil) | each | $195.00 | $160.00 – $210.40 | 24 | Nov 4, 2026, line 265 ↗ |
| Reflective pavement marking type i (w)(word)(100mil) | each | $216.26 | $193.75 – $263.75 | 24 | Nov 4, 2026, line 269 ↗ |
| Reflective pavement marker type ii-a-a | each | $5.47 | $4.69 – $7.46 | 24 | Nov 4, 2026, line 287 ↗ |
| Temporary sediment control fence (install) | linear foot | $4.50 | $3.62 – $5.00 | 21 | Nov 12, 2026, line 21 ↗ |
| Temporary sediment control fence (remove) | linear foot | $1.00 | $0.96 – $1.20 | 21 | Nov 12, 2026, line 22 ↗ |
| Tack Coat | gallon | $2.90 | $1.00 – $4.00 | 21 | Nov 4, 2026, line 26 ↗ |
| Driveway (acp) | square yard | $58.00 | $49.00 – $83.00 | 21 | Nov 4, 2026, line 155 ↗ |
| Temporary SPL Shoring | square foot | $35.00 | $20.00 – $42.00 | 21 | Nov 4, 2026, line 32 ↗ |
| Excavation (Roadway) | cubic yard | $18.00 | $9.50 – $28.00 | 21 | Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗ |
| Guardrail End Treatment (Install) | each | $3,000 | $2,947 – $3,224 | 20 | Nov 4, 2026, line 174 ↗ |
| Block Sodding | square yard | $5.92 | $4.54 – $8.18 | 20 | Nov 4, 2026, line 15 ↗ |
| Pavement surface preparation for marking (8 inch) | linear foot | $0.21 | $0.085 – $0.405 | 19 | Nov 4, 2026, line 294 ↗ |
| Reflective pavement marker type i-c | each | $5.50 | $4.83 – $7.52 | 19 | Nov 4, 2026, line 286 ↗ |
| In small road sign support&assembly type10bwg(1)sa(p) | each | $653.87 | $600.00 – $780.00 | 17 | Nov 4, 2026, line 226 ↗ |
| Construction Exits (Remove) | square yard | $10.00 | $5.00 – $11.99 | 17 | Nov 4, 2026, line 134 ↗ |
| Biodegradable erosion control logs (install) (12 inch) | linear foot | $7.00 | $6.00 – $7.40 | 17 | Nov 4, 2026, line 137 ↗ |
| Pavement surface preparation for marking (arrow) | each | $25.90 | $12.33 – $40.00 | 16 | Nov 4, 2026, line 297 ↗ |
| Rock Filter Dams (Remove) | linear foot | $13.58 | $10.98 – $20.25 | 16 | Nov 12, 2026, line 20 ↗ |
| Construction exits (install) (type 1) | square yard | $30.62 | $15.00 – $36.02 | 16 | Nov 4, 2026, line 133 ↗ |
| In small road sign support&assembly type10bwg(1)sa(t) | each | $820.00 | $715.00 – $900.00 | 15 | Nov 4, 2026, line 227 ↗ |
| Pavement surface preparation for marking (24 inch) | linear foot | $1.00 | $0.58 – $1.38 | 15 | Nov 4, 2026, line 296 ↗ |
| Pavement surface preparation for marking (word) | each | $20.00 | $13.89 – $42.50 | 15 | Nov 4, 2026, line 300 ↗ |
| Compost manuf topsoil (4 inch) | square yard | $1.80 | $0.72 – $3.25 | 15 | Nov 4, 2026, line 14 ↗ |
| Rc pipe (class iii)(24 in) | linear foot | $105.00 | $85.75 – $120.00 | 13 | Nov 4, 2026, line 79 ↗ |
| SP Mixes Sp-c Sac-b PG64-22 | ton | $125.00 | $116.00 – $166.00 | 13 | Nov 4, 2026, line 24 ↗ |
| Riprap (concrete)(4 in) | cubic yard | $560.00 | $516.00 – $750.00 | 13 | Nov 4, 2026, line 59 ↗ |
| Remove str (pipe) | linear foot | $21.94 | $10.00 – $33.25 | 12 | Nov 4, 2026, line 121 ↗ |
| Rock filter dams (install) (type 2) | linear foot | $42.88 | $39.49 – $46.50 | 12 | Nov 4, 2026, line 130 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | $729.27 | $602.96 – $830.96 | 12 | Nov 12, 2026, line 10 ↗ |