Construction unit costs in Tarrant County, TX

Median awarded unit prices for 80 items on public projects in Tarrant County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Texas › Tarrant County

ItemPerMedianMiddle halfWinning bidsLatest source document
Trench Safetylinear foot$2.00$1.00 – $3.34498Sep 17, 2026, p.1 ↗
Post - CCTV Inspectionlinear foot$3.60$2.41 – $5.00248Sep 16, 2026, p.1 ↗
Manhole Vacuum Testingeach$250.00$200.00 – $500.00238Sep 16, 2026, Open the source page, p.4 ↗
8 inch gate valveeach$2,569$2,250 – $3,200221Sep 16, 2026, p.1 ↗
4' Manholeeach$7,400$4,951 – $10,500205Sep 16, 2026, p.1 ↗
Barrier Free Ramp, Type P- 1each$2,200$1,358 – $2,785195Sep 17, 2026, p.1 ↗
6 inch gate valveeach$2,120$1,790 – $2,785164Sep 14, 2026, p.1 ↗
1 inch water serviceeach$1,989$1,225 – $3,500159Sep 14, 2026, p.1 ↗
2 inch conduit pvc sch 80 (t)linear foot$21.63$15.00 – $29.98150Sep 14, 2026, p.1 ↗
Block Sod Placementsquare yard$8.00$6.00 – $11.95147Sep 17, 2026, p.1 ↗
12 inch gate valveeach$4,810$4,362 – $6,000140Sep 16, 2026, p.1 ↗
2 inch water serviceeach$4,500$3,188 – $6,372140Sep 16, 2026, Open the source page, p.25 ↗
Fire Hydranteach$6,574$5,500 – $7,88087Sep 14, 2026, p.1 ↗
Connection to existing 4 inch- 12 inch watereach$2,500$1,500 – $4,45077Sep 3, 2026, p.1 ↗
Ductile iron water fitting w/ton$10,035$6,000 – $14,13969Sep 16, 2026, p.1 ↗
Concrete Collareach$821.81$500.00 – $1,00063Sep 16, 2026, Open the source page, p.26 ↗
4 inch sewer servicelinear foot$1,253$900.00 – $2,40060Sep 16, 2026, Open the source page, p.5 ↗
4 inch concrete sidewalksquare foot$7.30$5.57 – $10.8859Sep 17, 2026, p.1 ↗
Biodegradable erosion control logs (remove)linear foot$1.25$1.00 – $3.0053Sep 28, 2026, line 17 ↗
Remove concrete curb & gutterlinear foot$13.00$10.00 – $21.0546Sep 16, 2026, p.1 ↗
Trench Water Stopseach$617.51$350.00 – $1,30045Sep 16, 2026, p.1 ↗
Topsoilcubic yard$28.00$28.00 – $67.6644Sep 17, 2026, p.1 ↗
8 inch sewer pipelinear foot$80.50$64.47 – $116.5044Sep 16, 2026, p.1 ↗
6 inch lime treatmentsquare yard$4.50$4.00 – $10.0044Sep 17, 2026, p.1 ↗
10' Curb Inleteach$4,550$4,000 – $7,88044Sep 17, 2026, p.1 ↗
Portable Changeable Message Signday$125.00$70.00 – $172.5043Oct 21, 2026, line 2 ↗
8 inch water pipelinear foot$62.00$55.28 – $107.0041Sep 16, 2026, p.1 ↗
4 inch- 12 inch pressure plugeach$845.00$500.00 – $1,25040Aug 19, 2026, p.1 ↗
Reflective pavement marking type i (w)8 inch(solid)(100mil)linear foot$1.18$0.885 – $1.5038Oct 21, 2026, line 4 ↗
4 inch sewer serviceeach$1,100$850.00 – $1,88438Sep 16, 2026, p.1 ↗
4' Storm Junction Boxeach$6,000$5,500 – $7,21437Sep 17, 2026, p.1 ↗
Reflective pavement marking type i (w)(arrow)(100mil)each$173.40$148.75 – $200.0036Sep 3, 2026, line 23 ↗
Reflective pavement marking type i (w)(word)(100mil)each$197.00$162.25 – $233.7536Sep 3, 2026, line 26 ↗
Remove concrete pavementsquare yard$20.25$14.25 – $37.5036Sep 16, 2026, p.1 ↗
Temporary sediment control fence (install)linear foot$3.55$1.50 – $4.2035Sep 28, 2026, line 14 ↗
Temporary sediment control fence (remove)linear foot$1.00$0.95 – $1.7635Sep 28, 2026, line 15 ↗
Reflective pavement marking type i (w)24 inch(solid)(100mil)linear foot$7.81$6.68 – $11.7834Sep 3, 2026, line 22 ↗
Remove Sidewalksquare foot$3.15$2.00 – $5.0034Sep 16, 2026, p.1 ↗
Elim ext pavement marking & mrks (4 inch)linear foot$1.00$0.65 – $1.5033Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗
Reflective pavement marker type ii-c-reach$4.45$4.00 – $6.0032Oct 21, 2026, line 13 ↗
20 inch casing by open cutlinear foot$253.50$223.19 – $304.0632Jul 28, 2026, p.1 ↗
8 inch pvc water pipelinear foot$75.94$59.75 – $104.2532Aug 24, 2026, p.1 ↗
Reflective pavement marker type ii-a-aeach$5.00$4.22 – $6.0031Oct 21, 2026, line 12 ↗
4' Drop Manholeeach$10,500$5,850 – $14,66030Sep 16, 2026, p.1 ↗
15' Curb Inleteach$5,400$5,000 – $8,15030Sep 17, 2026, p.1 ↗
6 inch concrete curb and gutterlinear foot$30.00$20.00 – $78.0029Aug 24, 2026, p.1 ↗
Hydrated Limeton$320.00$252.62 – $370.0028Aug 24, 2026, p.1 ↗
6 inch pvc water pipelinear foot$76.68$56.00 – $112.8628Aug 27, 2026, p.1 ↗
Elim ext pavement marking & mrks (8 inch)linear foot$1.10$0.9 – $2.0027Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗
6 inch concrete pavementsquare yard$62.00$53.50 – $86.2227Sep 17, 2026, p.1 ↗
6 inch water pipelinear foot$91.00$56.50 – $187.7227Sep 14, 2026, p.1 ↗
24 inch reinforced concrete pipe, class iiilinear foot$94.18$85.00 – $106.5027Sep 17, 2026, p.1 ↗
6 inch water linelinear foot$73.00$60.50 – $182.0027Sep 14, 2026, Open the source page, p.4 ↗
Elim ext pavement marking & mrks (24 inch)linear foot$3.50$2.70 – $4.0026Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗
Remove asphalt pavementsquare yard$12.00$7.40 – $25.5026Aug 28, 2026, p.1 ↗
Concrete curb & gutter (type ii)linear foot$43.00$35.00 – $65.0025Sep 28, 2026, line 18 ↗
SP Mixes Sp-c Sac-a PG70-28ton$158.00$145.00 – $195.0025Aug 6, 2026, line 5 ↗
8 inch lime treatmentsquare yard$5.00$5.00 – $7.5025Sep 17, 2026, p.1 ↗
12 inch pvc water pipelinear foot$104.00$92.00 – $126.0025Aug 27, 2026, p.1 ↗
Furnish/ install aluminum sign groundeach$550.00$375.00 – $650.0025Sep 17, 2026, p.1 ↗
Reflective pavement marker type i-ceach$4.60$4.00 – $6.5025Oct 21, 2026, line 11 ↗
Trf signal cbl (type a)(14 awg)(20 conductor)linear foot$7.58$5.50 – $10.0024Aug 6, 2026, line 83 ↗
Guardrail End Treatment (Install)each$3,050$2,931 – $3,50024Oct 7, 2026, line 7 ↗
Wk zn pavement marking sht terminal (tab)type weach$2.00$1.00 – $2.3624Sep 3, 2026, line 18 ↗
Remove Metal Beam Guard Fencelinear foot$3.00$2.50 – $5.0024Aug 6, 2026, line 33 ↗
Rock Filter Dams (Remove)linear foot$16.00$12.75 – $20.5024Aug 5, 2026, line 137 ↗
Remove small road sign support&assemblyeach$190.00$100.00 – $324.9023Aug 6, 2026, line 41 ↗
Block Soddingsquare yard$10.00$6.88 – $13.1023Aug 6, 2026, line 5 ↗
Inlet Protectioneach$250.00$150.00 – $250.0023Sep 17, 2026, p.1 ↗
8 inch sewer pipe, css backfilllinear foot$94.00$84.00 – $146.5023Sep 16, 2026, p.1 ↗
Barrier Free Ramp, Type R- 1each$2,400$2,000 – $2,97223Sep 17, 2026, p.1 ↗
Excavation (Roadway)cubic yard$35.00$25.00 – $55.0023May 12, 2026, Open the source page, p.32 ↗
Trf signal cbl (type a)(14 awg)(5 conductor)linear foot$3.09$2.22 – $4.7822Aug 6, 2026, line 62 ↗
Remove traffic signaleach$9,957$7,500 – $14,09022Aug 6, 2026, line 51 ↗
8 inch waterline loweringeach$5,500$4,525 – $6,44822Aug 19, 2026, p.1 ↗
Trench Safety (Co# 1)linear foot$2.00$1.00 – $2.8822Jul 27, 2026, p.1 ↗
8 inch dip sewer pipelinear foot$132.87$100.00 – $149.5022Aug 19, 2026, p.1 ↗
Furnish/ Install Led Lighting Fixtureeach$792.50$397.87 – $1,17522Aug 12, 2026, p.1 ↗
Reflective pavement marking type i (w)12 inch(solid)(100mil)linear foot$3.75$3.00 – $4.5021Sep 3, 2026, line 21 ↗
Biodegradable erosion control logs (install) (12 inch)linear foot$8.00$5.78 – $10.0021Sep 3, 2026, line 10 ↗