| TMA (Stationary) | day | $235.00 | $82.50 – $355.25 | 175 | Nov 10, 2026, line 4 ↗ |
| Portable Changeable Message Sign | day | $100.00 | $50.00 – $200.00 | 124 | Nov 10, 2026, line 3 ↗ |
| Reflective pavement marker type ii-c-r | each | $6.00 | $5.33 – $7.40 | 78 | Sep 2, 2026, line 21 ↗ |
| Pavement surface preparation for marking (arrow) | each | $10.00 | $5.17 – $13.00 | 68 | Sep 2, 2026, line 26 ↗ |
| Pavement surface preparation for marking (word) | each | $10.16 | $5.52 – $15.00 | 68 | Sep 2, 2026, line 28 ↗ |
| Pavement surface preparation for marking (8 inch) | linear foot | $0.07 | $0.02 – $0.1 | 63 | Sep 2, 2026, line 23 ↗ |
| Pavement surface preparation for marking (24 inch) | linear foot | $0.45 | $0.245 – $0.53 | 59 | Sep 2, 2026, line 25 ↗ |
| Pavement surface preparation for marking (12 inch) | linear foot | $0.21 | $0.1 – $0.26 | 57 | Sep 2, 2026, line 24 ↗ |
| Reflective pavement marker type ii-a-a | each | $6.00 | $5.50 – $8.00 | 53 | Aug 11, 2026, line 35 ↗ |
| Pavement surface preparation for marking (dbl arrow) | each | $10.34 | $5.67 – $19.12 | 51 | Sep 2, 2026, line 27 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | $7.17 | $6.26 – $8.47 | 46 | Aug 11, 2026, line 6 ↗ |
| Reflective pavement marker type i-c | each | $6.00 | $6.00 – $6.78 | 46 | Jun 3, 2026, line 42 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | $1.45 | $1.00 – $2.11 | 44 | Aug 11, 2026, line 5 ↗ |
| Block Sodding | square yard | $5.56 | $4.50 – $8.00 | 44 | Nov 3, 2026, line 3 ↗ |
| Conduit (pvc) (sch 80) (2 inch) (bore) | linear foot | $20.05 | $17.85 – $24.45 | 39 | Nov 3, 2026, line 9 ↗ |
| Biodegradable erosion control logs (remove) | linear foot | $1.00 | $0.75 – $2.00 | 39 | Nov 3, 2026, line 27 ↗ |
| Remove Metal Beam Guard Fence | linear foot | $3.00 | $2.30 – $5.25 | 37 | Aug 6, 2026, line 23 ↗ |
| Conduit (pvc) (sch 80) (2 inch) | linear foot | $13.82 | $11.00 – $18.37 | 37 | Aug 5, 2026, line 7 ↗ |
| Ground box type d (162922)w/apron | each | $1,368 | $1,243 – $1,700 | 37 | Nov 3, 2026, line 19 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | $650.00 | $499.81 – $830.00 | 37 | Aug 6, 2026, line 12 ↗ |
| In small road sign support&assembly type10bwg(1)sa(p) | each | $650.00 | $587.53 – $848.00 | 36 | Oct 13, 2026, line 7 ↗ |
| Elim ext pavement marking & mrks (12 inch) | linear foot | $1.50 | $1.00 – $1.98 | 35 | Nov 6, 2024, line 117 ↗ |
| Elim ext pavement marking & mrks (6 inch) | linear foot | $0.35 | $0.28 – $0.535 | 35 | Nov 6, 2024, line 115 ↗ |
| Downstream Anchor Terminal Section | each | $1,426 | $1,250 – $1,598 | 34 | Aug 6, 2026, line 22 ↗ |
| Elim ext pm & mrks (6 inch) | linear foot | $0.49 | $0.35 – $0.725 | 34 | Sep 2, 2026, line 25 ↗ |
| Cement stabilized backfill | cubic yard | $68.00 | $57.30 – $190.00 | 33 | Oct 7, 2026, line 7 ↗ |
| Metal beam guard fence transition (thrie-beam) | each | $2,006 | $1,738 – $2,441 | 32 | Aug 6, 2026, line 21 ↗ |
| Guardrail End Treatment (Install) | each | $3,231 | $2,957 – $3,710 | 32 | Aug 6, 2026, line 27 ↗ |
| Remove small road sign support&assembly | each | $109.10 | $80.84 – $149.02 | 32 | Jun 2, 2026, line 78 ↗ |
| Fertilizer | acre | $1,000 | $773.25 – $1,763 | 32 | Apr 8, 2026, line 14 ↗ |
| Pavement surface preparation for marking (uturn arr) | each | $10.63 | $5.00 – $16.06 | 32 | Aug 11, 2026, line 52 ↗ |
| Elim ext pavement marking & mrks (8 inch) | linear foot | $0.72 | $0.5 – $0.84 | 32 | Nov 6, 2024, line 116 ↗ |
| Concrete str repair (vertical & overhead) | square foot | $190.00 | $106.25 – $263.50 | 32 | Oct 7, 2026, line 1 ↗ |
| Elim ext pavement marking & mrks (arrow) | each | $44.00 | $29.75 – $68.50 | 31 | Nov 6, 2024, line 119 ↗ |
| Elim ext pavement marking & mrks (word) | each | $50.00 | $39.00 – $76.47 | 31 | Nov 6, 2024, line 120 ↗ |
| Prefab pm type c (w)(word) | each | $305.00 | $267.50 – $358.34 | 31 | Sep 2, 2026, line 20 ↗ |
| Clean and seal existing joint | linear foot | $32.00 | $25.00 – $43.84 | 30 | Oct 7, 2026, line 12 ↗ |
| Temporary sediment control fence (install) | linear foot | $4.00 | $3.45 – $4.15 | 30 | Aug 6, 2026, line 19 ↗ |
| Re pv marking type i(black)6 inch(shadow)(100mil) | linear foot | $1.02 | $0.96 – $1.50 | 30 | Jun 3, 2026, line 35 ↗ |
| Reflective pavement marking type i (w)12 inch(solid)(100mil) | linear foot | $3.50 | $3.00 – $4.32 | 29 | Jun 3, 2026, line 29 ↗ |
| Temporary sediment control fence (remove) | linear foot | $1.00 | $1.00 – $1.20 | 29 | Aug 6, 2026, line 20 ↗ |
| Adjusting manhole | each | $524.00 | $300.00 – $1,150 | 29 | May 7, 2026, line 16 ↗ |
| Prefab pm type c (w)(arrow) | each | $235.00 | $190.00 – $265.00 | 29 | Sep 2, 2026, line 18 ↗ |
| Electrical conductor (no.8) bare | linear foot | $1.92 | $1.59 – $2.10 | 28 | Jun 3, 2026, line 18 ↗ |
| Metal w-beam guard fence (timber post) | linear foot | $27.75 | $24.90 – $33.90 | 28 | Aug 6, 2026, line 20 ↗ |
| Reflective pavement marking type i (w)(arrow)(100mil) | each | $167.43 | $136.25 – $206.25 | 28 | Aug 11, 2026, line 7 ↗ |
| Reflective pavement marking type i (w)(word)(100mil) | each | $222.50 | $155.75 – $258.57 | 28 | Jun 3, 2026, line 34 ↗ |
| Conduit (pvc) (sch 80) (4 inch) (bore) | linear foot | $32.99 | $30.10 – $35.55 | 28 | Jun 3, 2026, line 17 ↗ |
| Remove concrete (driveway) | square yard | $11.50 | $5.00 – $18.82 | 27 | Nov 6, 2024, line 6 ↗ |
| In small road sign support&assembly type10bwg(1)sa(t) | each | $798.68 | $662.50 – $901.00 | 27 | Oct 13, 2026, line 9 ↗ |
| Reflective pavement marking type i (w)6 inch(dot)(100mil) | linear foot | $2.00 | $1.60 – $2.21 | 27 | Jun 3, 2026, line 27 ↗ |
| Embankment (final)(dens control)(type c) | cubic yard | $31.60 | $16.88 – $45.93 | 26 | Nov 6, 2024, line 12 ↗ |
| Elim ext pavement marking & mrks (24 inch) | linear foot | $2.62 | $2.00 – $3.15 | 26 | Nov 6, 2024, line 118 ↗ |
| Biodegradable erosion control logs (install) (8 inch) | linear foot | $5.10 | $3.00 – $6.62 | 26 | Nov 3, 2026, line 26 ↗ |
| Elim Ext PM & Mrks (Arrow) | each | $53.00 | $40.50 – $79.50 | 26 | Sep 2, 2026, line 28 ↗ |
| Elim Ext PM & Mrks (Word) | each | $57.50 | $45.00 – $79.00 | 26 | Sep 2, 2026, line 30 ↗ |
| Re pm type iii (blk)(6 inch)(shadow) | linear foot | $0.925 | $0.76 – $2.02 | 26 | Sep 2, 2026, line 16 ↗ |
| Construction Exits (Remove) | square yard | $10.00 | $7.50 – $15.00 | 25 | Aug 6, 2026, line 18 ↗ |
| Guardrail End Treatment (Remove) | each | $290.00 | $204.00 – $350.14 | 25 | Aug 6, 2026, line 28 ↗ |
| Reflective pavement marking type ii (y) 12 inch (solid) | linear foot | $2.00 | $1.10 – $2.25 | 25 | Nov 6, 2024, line 111 ↗ |
| Lime(hydrant,com or qk)(slry)or qk(dry) | ton | $316.00 | $208.97 – $353.38 | 24 | Oct 2, 2024, line 23 ↗ |
| Wk zn pavement marking remove (w)4 inch(solid) | linear foot | $1.33 | $0.738 – $1.69 | 24 | Apr 8, 2026, line 130 ↗ |
| Reflective pavement marking type i(w)(exit gore)(100mil) | each | $650.50 | $575.00 – $843.75 | 24 | Aug 11, 2026, line 11 ↗ |
| Conduit (pvc) (sch 80) (3 inch) | linear foot | $19.35 | $18.00 – $25.50 | 24 | Jun 3, 2026, line 14 ↗ |
| Reflective pavement marking type i (y)12 inch(solid)(100mil) | linear foot | $3.33 | $3.00 – $3.92 | 24 | Aug 6, 2026, line 39 ↗ |
| Elim ext pm & mrks (8 inch) | linear foot | $0.765 | $0.588 – $0.985 | 24 | Aug 11, 2026, line 38 ↗ |
| Elim ext pm & mrks (12 inch) | linear foot | $1.18 | $1.00 – $2.00 | 24 | Sep 2, 2026, line 27 ↗ |
| Prefab pm type c (w)(dbl arrow) | each | $333.46 | $299.25 – $405.00 | 24 | Sep 2, 2026, line 19 ↗ |
| Prefab pavement marking type c (w) (word) | each | $280.90 | $266.25 – $323.25 | 24 | Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗ |
| Reflective pavement marking type i (y)8 inch(solid)(100mil) | linear foot | $1.24 | $1.00 – $2.17 | 23 | Aug 11, 2026, line 14 ↗ |
| Port ctb (move)(low prof)(type 1) | linear foot | $10.00 | $6.00 – $10.20 | 23 | Feb 4, 2026, line 106 ↗ |
| Port ctb (move)(low prof)(type 2) | linear foot | $10.00 | $8.11 – $13.50 | 23 | Feb 4, 2026, line 107 ↗ |
| Wk zn pavement marking remove (w)(arrow) | each | $160.00 | $132.89 – $205.50 | 23 | Apr 8, 2026, line 134 ↗ |
| Rc pipe (class iii)(18 in) | linear foot | $114.05 | $88.38 – $150.00 | 23 | Jun 2, 2026, line 32 ↗ |
| Pedestrian detector push button (aps) | each | $800.00 | $714.56 – $921.73 | 23 | Nov 3, 2026, line 40 ↗ |
| Reflective pavement marker type i-a | each | $6.00 | $5.15 – $6.95 | 23 | Aug 11, 2026, line 34 ↗ |
| Pavement Sealer (arrow) | each | $10.00 | $5.15 – $20.30 | 23 | Aug 6, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-06 ↗ |
| Pavement Sealer (word) | each | $11.00 | $5.15 – $20.30 | 23 | Aug 6, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-06 ↗ |
| Ground box type d (162922) | each | $980.50 | $815.47 – $1,394 | 23 | Jun 3, 2026, line 21 ↗ |
| Re pm type iii (w)(12 inch)(solid) | linear foot | $3.88 | $2.05 – $5.15 | 23 | Sep 2, 2026, line 12 ↗ |