| Biodegradable erosion control logs (remove) | linear foot | $1.17 | $1.00 – $2.15 | 80 | Oct 7, 2026, line 28 ↗ |
| Reflective pavement marker type ii-c-r | each | $6.00 | $4.60 – $7.09 | 65 | Oct 14, 2026, line 15 ↗ |
| Pavement surface preparation for marking (6 inch) | linear foot | $0.25 | $0.09 – $0.4 | 45 | Sep 3, 2026, line 179 ↗ |
| Block Sodding | square yard | $7.74 | $5.11 – $11.00 | 44 | Sep 3, 2026, line 6 ↗ |
| Electrical conductor (no.6) bare | linear foot | $2.75 | $2.00 – $3.25 | 41 | Nov 12, 2026, line 39 ↗ |
| Biodegradable erosion control logs (install) (18 inch) | linear foot | $5.70 | $3.26 – $10.00 | 41 | Oct 7, 2026, line 10 ↗ |
| Electrical conductor (no.6) insulated | linear foot | $2.98 | $2.29 – $3.67 | 40 | Nov 12, 2026, line 40 ↗ |
| Tack Coat | gallon | $4.10 | $1.58 – $6.21 | 40 | Oct 14, 2026, line 2 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | $1.50 | $1.04 – $2.00 | 38 | Oct 14, 2026, line 11 ↗ |
| Temporary sediment control fence (remove) | linear foot | $1.00 | $1.00 – $1.21 | 38 | Oct 7, 2026, line 26 ↗ |
| Electrical conductor (no.8) insulated | linear foot | $2.75 | $2.00 – $3.00 | 37 | Nov 12, 2026, line 38 ↗ |
| Temporary sediment control fence (install) | linear foot | $3.99 | $3.00 – $5.00 | 37 | Oct 7, 2026, line 25 ↗ |
| Biodegradable erosion control logs (install) (12 inch) | linear foot | $5.88 | $4.50 – $7.50 | 34 | Oct 7, 2026, line 27 ↗ |
| Conduit (pvc) (sch 80) (2 inch) | linear foot | $24.00 | $21.00 – $30.00 | 33 | Nov 12, 2026, line 28 ↗ |
| Reflective pavement marker type ii-a-a | each | $6.00 | $4.90 – $7.74 | 32 | Sep 3, 2026, line 165 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | $8.50 | $6.65 – $10.75 | 31 | Oct 7, 2026, line 51 ↗ |
| Pavement surface preparation for marking (arrow) | each | $24.00 | $14.00 – $54.65 | 31 | Sep 3, 2026, line 183 ↗ |
| Concrete curb (type ii) | linear foot | $50.70 | $25.00 – $69.95 | 30 | Sep 3, 2026, line 23 ↗ |
| Pedestrian pole assembly | each | $3,290 | $2,305 – $3,879 | 30 | Oct 7, 2026, line 67 ↗ |
| Downstream Anchor Terminal Section | each | $1,409 | $1,235 – $1,825 | 30 | Oct 7, 2026, line 14 ↗ |
| Riprap (concrete)(4 in) | cubic yard | $1,056 | $711.77 – $1,424 | 30 | Oct 7, 2026, line 12 ↗ |
| Concrete str repair (vertical & overhead) | square foot | $192.50 | $146.25 – $220.00 | 30 | Nov 12, 2026, line 3 ↗ |
| Guardrail End Treatment (Install) | each | $3,204 | $3,000 – $3,850 | 29 | Oct 7, 2026, line 16 ↗ |
| Pavement surface preparation for marking (word) | each | $30.00 | $15.75 – $67.00 | 29 | Sep 3, 2026, line 185 ↗ |
| Compost manuf topsoil (4 inch) | square yard | $2.75 | $1.30 – $5.00 | 29 | May 7, 2026, line 6 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | $700.00 | $650.00 – $840.00 | 29 | Oct 7, 2026, line 4 ↗ |
| Remove Metal Beam Guard Fence | linear foot | $3.00 | $2.50 – $6.62 | 28 | Oct 6, 2026, line 29 ↗ |
| Reflective pavement marking type i (w)12 inch(solid)(100mil) | linear foot | $4.20 | $3.00 – $5.00 | 28 | Oct 14, 2026, line 12 ↗ |
| Reflective pavement marking type i (w)(word)(100mil) | each | $202.50 | $160.75 – $251.74 | 28 | Sep 3, 2026, line 117 ↗ |
| Ground Box (Prepare) | each | $400.00 | $244.53 – $700.10 | 28 | Nov 12, 2026, line 102 ↗ |
| Trf signal cbl (type a)(14 awg)(7 conductor) | linear foot | $4.00 | $3.27 – $4.50 | 27 | Oct 7, 2026, line 63 ↗ |
| Flowable Backfill | cubic yard | $380.00 | $300.21 – $565.00 | 27 | Nov 12, 2026, line 1 ↗ |
| Ground box type d (162922)w/apron | each | $2,400 | $1,985 – $2,875 | 27 | Oct 7, 2026, line 43 ↗ |
| Vehicle signal section (12 inch)led(yellow) | each | $368.80 | $310.50 – $440.72 | 27 | Oct 7, 2026, line 59 ↗ |
| Reflective pavement marking type i (w)(arrow)(100mil) | each | $170.00 | $154.00 – $225.00 | 27 | Sep 3, 2026, line 115 ↗ |
| Pavement sler 6 inch | linear foot | $0.3 | $0.2 – $0.45 | 27 | Sep 3, 2026, line 129 ↗ |
| Conduit (Prepare) | linear foot | $4.50 | $1.79 – $6.52 | 27 | Nov 12, 2026, line 34 ↗ |
| Trf signal cbl (type c)(12 awg)(2 conductor) | linear foot | $3.10 | $2.40 – $3.80 | 27 | Oct 7, 2026, line 65 ↗ |
| Guardrail End Treatment (Remove) | each | $300.00 | $252.50 – $491.84 | 27 | Oct 6, 2026, line 33 ↗ |
| Electrical conductor (no.12) insulated | linear foot | $2.00 | $1.50 – $2.45 | 26 | Nov 12, 2026, line 36 ↗ |
| Aluminum sign (type a) | square foot | $41.40 | $35.04 – $43.85 | 26 | Oct 7, 2026, line 45 ↗ |
| Drill shaft (trf signal pole) (36 in) | linear foot | $618.10 | $481.98 – $737.50 | 26 | Sep 3, 2026, line 11 ↗ |
| Vehicle signal section (12 inch)led(red) | each | $366.25 | $305.25 – $442.50 | 26 | Oct 7, 2026, line 60 ↗ |
| Pavement sler 24 inch | linear foot | $1.98 | $1.03 – $2.91 | 26 | Sep 3, 2026, line 132 ↗ |
| Ground box type a (122311)w/apron | each | $1,820 | $1,576 – $2,392 | 26 | Nov 12, 2026, line 45 ↗ |
| Pavement surface preparation for marking (4 inch) | linear foot | $0.2 | $0.1 – $0.292 | 26 | Sep 3, 2026, line 178 ↗ |
| Trf signal cbl (type a)(14 awg)(5 conductor) | linear foot | $3.44 | $2.80 – $4.00 | 25 | Sep 3, 2026, line 210 ↗ |
| Trf signal cbl (type a)(14 awg)(20 conductor) | linear foot | $7.05 | $6.30 – $11.00 | 25 | Sep 3, 2026, line 216 ↗ |
| In small road sign support&assembly type10bwg(1)sa(t) | each | $888.00 | $775.00 – $1,009 | 25 | Sep 3, 2026, line 97 ↗ |
| Vehicle signal section (12 inch)led(grn) | each | $363.70 | $300.00 – $420.00 | 25 | Sep 3, 2026, line 199 ↗ |
| Vehicle signal section (12 inch)led(grn arw) | each | $363.70 | $300.00 – $425.00 | 25 | Sep 3, 2026, line 200 ↗ |
| Vehicle signal section (12 inch)led(yellow arw) | each | $363.70 | $300.00 – $425.00 | 25 | Sep 3, 2026, line 202 ↗ |
| Vehicle signal section (12 inch)led(red arw) | each | $368.80 | $300.00 – $425.00 | 25 | Sep 3, 2026, line 204 ↗ |
| Pedestrian signal section (led)(countdown) | each | $925.00 | $733.00 – $1,010 | 25 | Oct 7, 2026, line 61 ↗ |
| Pedestrian detector push button (aps) | each | $1,131 | $950.00 – $1,500 | 25 | Oct 7, 2026, line 68 ↗ |
| Crash cush attenuator (remove) | each | $1,200 | $775.00 – $2,100 | 25 | Oct 6, 2026, line 34 ↗ |
| Pavement sealer 24 inch | linear foot | $2.00 | $1.49 – $2.80 | 25 | Feb 7, 2025, line 428 ↗ |
| Re pm w/ret req type i (w)6 inch(solid)(100mil) | linear foot | $0.89 | $0.68 – $1.05 | 25 | Feb 7, 2025, line 438 ↗ |
| Conduit (pvc) (sch 40) (2 inch) | linear foot | $20.00 | $14.69 – $26.00 | 24 | Nov 12, 2026, line 24 ↗ |
| Remove Terminal Anchor Section | each | $217.50 | $200.00 – $283.73 | 24 | Oct 6, 2026, line 30 ↗ |
| Pedestrian detector controller unit | each | $4,290 | $3,853 – $5,250 | 24 | Oct 7, 2026, line 69 ↗ |
| Construction exits (install) (type 1) | square yard | $34.00 | $29.00 – $35.58 | 24 | Oct 7, 2026, line 23 ↗ |
| Construction Exits (Remove) | square yard | $12.00 | $10.00 – $15.00 | 24 | Oct 7, 2026, line 24 ↗ |
| Reflective pavement marking type i (y)6 inch(solid)(100mil) | linear foot | $1.00 | $0.68 – $1.50 | 24 | Oct 14, 2026, line 14 ↗ |
| Pavement sealer 8 inch | linear foot | $0.35 | $0.28 – $0.512 | 24 | Feb 7, 2025, line 426 ↗ |
| Elim ext pm & mrks (8 inch) | linear foot | $1.17 | $0.875 – $2.11 | 24 | Sep 3, 2026, line 169 ↗ |
| Electrical conductor (no.4) insulated | linear foot | $3.25 | $2.98 – $4.51 | 24 | Nov 12, 2026, line 42 ↗ |
| Re pm w/ret req type i (w)6 inch(broken)(100mil) | linear foot | $0.95 | $0.69 – $1.50 | 24 | Feb 7, 2025, line 437 ↗ |
| Install delineator assm (d-sw)sz 1(brf)gf2 | each | $26.00 | $25.00 – $47.00 | 24 | Oct 7, 2026, line 58 ↗ |
| Re pm w/ret req type i (y)6 inch(solid)(100mil) | linear foot | $0.88 | $0.68 – $1.01 | 24 | Feb 7, 2025, line 439 ↗ |
| Reflective pavement marking type i (w)6 inch(solid)(100mil) | linear foot | $1.00 | $0.67 – $1.38 | 23 | Oct 14, 2026, line 13 ↗ |
| In small road sign support&assembly type10bwg(1)sa(p) | each | $808.00 | $720.00 – $1,000 | 23 | Oct 7, 2026, line 46 ↗ |
| Electrical conductor (no.8) bare | linear foot | $2.65 | $1.96 – $3.10 | 23 | Nov 12, 2026, line 37 ↗ |
| Metal beam guard fence transition (thrie-beam) | each | $2,200 | $1,950 – $2,494 | 23 | Oct 7, 2026, line 13 ↗ |
| Curb ramp (type 5) | each | $4,000 | $3,508 – $5,131 | 23 | Sep 3, 2026, line 32 ↗ |
| Curb ramp (type 7) | each | $3,000 | $2,500 – $4,472 | 23 | Sep 3, 2026, line 34 ↗ |
| Drill shaft (trf signal pole) (48 in) | linear foot | $850.00 | $555.53 – $940.00 | 23 | Sep 3, 2026, line 12 ↗ |
| Pavement surface preparation for marking (12 inch) | linear foot | $0.7 | $0.45 – $1.02 | 23 | Sep 3, 2026, line 181 ↗ |
| Remove small road sign support&assembly | each | $142.00 | $109.50 – $210.50 | 23 | Oct 7, 2026, line 49 ↗ |
| Elim ext pavement marking & mrks (24 inch) | linear foot | $3.35 | $2.98 – $4.50 | 23 | Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗ |