Construction unit costs in Dallas County, TX

Median awarded unit prices for 80 items on public projects in Dallas County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Texas › Dallas County

ItemPerMedianMiddle halfWinning bidsLatest source document
Biodegradable erosion control logs (remove)linear foot$1.17$1.00 – $2.1580Oct 7, 2026, line 28 ↗
Reflective pavement marker type ii-c-reach$6.00$4.60 – $7.0965Oct 14, 2026, line 15 ↗
Pavement surface preparation for marking (6 inch)linear foot$0.25$0.09 – $0.445Sep 3, 2026, line 179 ↗
Block Soddingsquare yard$7.74$5.11 – $11.0044Sep 3, 2026, line 6 ↗
Electrical conductor (no.6) barelinear foot$2.75$2.00 – $3.2541Nov 12, 2026, line 39 ↗
Biodegradable erosion control logs (install) (18 inch)linear foot$5.70$3.26 – $10.0041Oct 7, 2026, line 10 ↗
Electrical conductor (no.6) insulatedlinear foot$2.98$2.29 – $3.6740Nov 12, 2026, line 40 ↗
Tack Coatgallon$4.10$1.58 – $6.2140Oct 14, 2026, line 2 ↗
Reflective pavement marking type i (w)8 inch(solid)(100mil)linear foot$1.50$1.04 – $2.0038Oct 14, 2026, line 11 ↗
Temporary sediment control fence (remove)linear foot$1.00$1.00 – $1.2138Oct 7, 2026, line 26 ↗
Electrical conductor (no.8) insulatedlinear foot$2.75$2.00 – $3.0037Nov 12, 2026, line 38 ↗
Temporary sediment control fence (install)linear foot$3.99$3.00 – $5.0037Oct 7, 2026, line 25 ↗
Biodegradable erosion control logs (install) (12 inch)linear foot$5.88$4.50 – $7.5034Oct 7, 2026, line 27 ↗
Conduit (pvc) (sch 80) (2 inch)linear foot$24.00$21.00 – $30.0033Nov 12, 2026, line 28 ↗
Reflective pavement marker type ii-a-aeach$6.00$4.90 – $7.7432Sep 3, 2026, line 165 ↗
Reflective pavement marking type i (w)24 inch(solid)(100mil)linear foot$8.50$6.65 – $10.7531Oct 7, 2026, line 51 ↗
Pavement surface preparation for marking (arrow)each$24.00$14.00 – $54.6531Sep 3, 2026, line 183 ↗
Concrete curb (type ii)linear foot$50.70$25.00 – $69.9530Sep 3, 2026, line 23 ↗
Pedestrian pole assemblyeach$3,290$2,305 – $3,87930Oct 7, 2026, line 67 ↗
Downstream Anchor Terminal Sectioneach$1,409$1,235 – $1,82530Oct 7, 2026, line 14 ↗
Riprap (concrete)(4 in)cubic yard$1,056$711.77 – $1,42430Oct 7, 2026, line 12 ↗
Concrete str repair (vertical & overhead)square foot$192.50$146.25 – $220.0030Nov 12, 2026, line 3 ↗
Guardrail End Treatment (Install)each$3,204$3,000 – $3,85029Oct 7, 2026, line 16 ↗
Pavement surface preparation for marking (word)each$30.00$15.75 – $67.0029Sep 3, 2026, line 185 ↗
Compost manuf topsoil (4 inch)square yard$2.75$1.30 – $5.0029May 7, 2026, line 6 ↗
Riprap (Mow Strip)(4 in)cubic yard$700.00$650.00 – $840.0029Oct 7, 2026, line 4 ↗
Remove Metal Beam Guard Fencelinear foot$3.00$2.50 – $6.6228Oct 6, 2026, line 29 ↗
Reflective pavement marking type i (w)12 inch(solid)(100mil)linear foot$4.20$3.00 – $5.0028Oct 14, 2026, line 12 ↗
Reflective pavement marking type i (w)(word)(100mil)each$202.50$160.75 – $251.7428Sep 3, 2026, line 117 ↗
Ground Box (Prepare)each$400.00$244.53 – $700.1028Nov 12, 2026, line 102 ↗
Trf signal cbl (type a)(14 awg)(7 conductor)linear foot$4.00$3.27 – $4.5027Oct 7, 2026, line 63 ↗
Flowable Backfillcubic yard$380.00$300.21 – $565.0027Nov 12, 2026, line 1 ↗
Ground box type d (162922)w/aproneach$2,400$1,985 – $2,87527Oct 7, 2026, line 43 ↗
Vehicle signal section (12 inch)led(yellow)each$368.80$310.50 – $440.7227Oct 7, 2026, line 59 ↗
Reflective pavement marking type i (w)(arrow)(100mil)each$170.00$154.00 – $225.0027Sep 3, 2026, line 115 ↗
Pavement sler 6 inchlinear foot$0.3$0.2 – $0.4527Sep 3, 2026, line 129 ↗
Conduit (Prepare)linear foot$4.50$1.79 – $6.5227Nov 12, 2026, line 34 ↗
Trf signal cbl (type c)(12 awg)(2 conductor)linear foot$3.10$2.40 – $3.8027Oct 7, 2026, line 65 ↗
Guardrail End Treatment (Remove)each$300.00$252.50 – $491.8427Oct 6, 2026, line 33 ↗
Electrical conductor (no.12) insulatedlinear foot$2.00$1.50 – $2.4526Nov 12, 2026, line 36 ↗
Aluminum sign (type a)square foot$41.40$35.04 – $43.8526Oct 7, 2026, line 45 ↗
Drill shaft (trf signal pole) (36 in)linear foot$618.10$481.98 – $737.5026Sep 3, 2026, line 11 ↗
Vehicle signal section (12 inch)led(red)each$366.25$305.25 – $442.5026Oct 7, 2026, line 60 ↗
Pavement sler 24 inchlinear foot$1.98$1.03 – $2.9126Sep 3, 2026, line 132 ↗
Ground box type a (122311)w/aproneach$1,820$1,576 – $2,39226Nov 12, 2026, line 45 ↗
Pavement surface preparation for marking (4 inch)linear foot$0.2$0.1 – $0.29226Sep 3, 2026, line 178 ↗
Trf signal cbl (type a)(14 awg)(5 conductor)linear foot$3.44$2.80 – $4.0025Sep 3, 2026, line 210 ↗
Trf signal cbl (type a)(14 awg)(20 conductor)linear foot$7.05$6.30 – $11.0025Sep 3, 2026, line 216 ↗
In small road sign support&assembly type10bwg(1)sa(t)each$888.00$775.00 – $1,00925Sep 3, 2026, line 97 ↗
Vehicle signal section (12 inch)led(grn)each$363.70$300.00 – $420.0025Sep 3, 2026, line 199 ↗
Vehicle signal section (12 inch)led(grn arw)each$363.70$300.00 – $425.0025Sep 3, 2026, line 200 ↗
Vehicle signal section (12 inch)led(yellow arw)each$363.70$300.00 – $425.0025Sep 3, 2026, line 202 ↗
Vehicle signal section (12 inch)led(red arw)each$368.80$300.00 – $425.0025Sep 3, 2026, line 204 ↗
Pedestrian signal section (led)(countdown)each$925.00$733.00 – $1,01025Oct 7, 2026, line 61 ↗
Pedestrian detector push button (aps)each$1,131$950.00 – $1,50025Oct 7, 2026, line 68 ↗
Crash cush attenuator (remove)each$1,200$775.00 – $2,10025Oct 6, 2026, line 34 ↗
Pavement sealer 24 inchlinear foot$2.00$1.49 – $2.8025Feb 7, 2025, line 428 ↗
Re pm w/ret req type i (w)6 inch(solid)(100mil)linear foot$0.89$0.68 – $1.0525Feb 7, 2025, line 438 ↗
Conduit (pvc) (sch 40) (2 inch)linear foot$20.00$14.69 – $26.0024Nov 12, 2026, line 24 ↗
Remove Terminal Anchor Sectioneach$217.50$200.00 – $283.7324Oct 6, 2026, line 30 ↗
Pedestrian detector controller uniteach$4,290$3,853 – $5,25024Oct 7, 2026, line 69 ↗
Construction exits (install) (type 1)square yard$34.00$29.00 – $35.5824Oct 7, 2026, line 23 ↗
Construction Exits (Remove)square yard$12.00$10.00 – $15.0024Oct 7, 2026, line 24 ↗
Reflective pavement marking type i (y)6 inch(solid)(100mil)linear foot$1.00$0.68 – $1.5024Oct 14, 2026, line 14 ↗
Pavement sealer 8 inchlinear foot$0.35$0.28 – $0.51224Feb 7, 2025, line 426 ↗
Elim ext pm & mrks (8 inch)linear foot$1.17$0.875 – $2.1124Sep 3, 2026, line 169 ↗
Electrical conductor (no.4) insulatedlinear foot$3.25$2.98 – $4.5124Nov 12, 2026, line 42 ↗
Re pm w/ret req type i (w)6 inch(broken)(100mil)linear foot$0.95$0.69 – $1.5024Feb 7, 2025, line 437 ↗
Install delineator assm (d-sw)sz 1(brf)gf2each$26.00$25.00 – $47.0024Oct 7, 2026, line 58 ↗
Re pm w/ret req type i (y)6 inch(solid)(100mil)linear foot$0.88$0.68 – $1.0124Feb 7, 2025, line 439 ↗
Reflective pavement marking type i (w)6 inch(solid)(100mil)linear foot$1.00$0.67 – $1.3823Oct 14, 2026, line 13 ↗
In small road sign support&assembly type10bwg(1)sa(p)each$808.00$720.00 – $1,00023Oct 7, 2026, line 46 ↗
Electrical conductor (no.8) barelinear foot$2.65$1.96 – $3.1023Nov 12, 2026, line 37 ↗
Metal beam guard fence transition (thrie-beam)each$2,200$1,950 – $2,49423Oct 7, 2026, line 13 ↗
Curb ramp (type 5)each$4,000$3,508 – $5,13123Sep 3, 2026, line 32 ↗
Curb ramp (type 7)each$3,000$2,500 – $4,47223Sep 3, 2026, line 34 ↗
Drill shaft (trf signal pole) (48 in)linear foot$850.00$555.53 – $940.0023Sep 3, 2026, line 12 ↗
Pavement surface preparation for marking (12 inch)linear foot$0.7$0.45 – $1.0223Sep 3, 2026, line 181 ↗
Remove small road sign support&assemblyeach$142.00$109.50 – $210.5023Oct 7, 2026, line 49 ↗
Elim ext pavement marking & mrks (24 inch)linear foot$3.35$2.98 – $4.5023Aug 2, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-02 ↗