Construction unit costs in Orange County, FL

Median awarded unit prices for 38 items on public projects in Orange County, from winning bids in agency bid tabulations. Each item page lists its source documents.

Cost by state › Florida › Orange County

ItemPerMedianMiddle halfWinning bidsLatest source document
Vehicle Detection Systemeach$11,156$7,957 – $12,40033Aug 26, 2026, Open bid tab, T5890 ↗
Electrical Service Wire, Furnishlinear foot$8.00$6.33 – $12.0029Aug 26, 2026, Open bid tab, T5890 ↗
Itsfm Location Documentationeach$1,700$1,500 – $2,30029Aug 26, 2026, Open bid tab, T5890 ↗
Conduit, Furnish & Installlinear foot$39.70$33.10 – $42.7528Aug 26, 2026, Open bid tab, T5890 ↗
Prestressed Concrete Pole, F&Ieach$2,271$1,784 – $2,86428Aug 26, 2026, Open bid tab, T5890 ↗
Thermoplastic, Standard, Whitelinear foot$7.00$5.07 – $9.3028Aug 26, 2026, Open bid tab, T5890 ↗
Paint pavement markinglinear foot$3.00$2.56 – $4.4026Aug 26, 2026, Open bid tab, T5890 ↗
Sign Panel, Furnish & Installeach$978.80$811.31 – $1,44626Aug 26, 2026, Open bid tab, T5890 ↗
Milling Existing Asphaltsquare yard$4.15$2.75 – $12.7526Aug 26, 2026, Open bid tab, T5890 ↗
Remove of existing concretesquare yard$41.28$31.48 – $62.3126Aug 26, 2026, Open bid tab, T5890 ↗
Paint pavement markingsquare foot$5.40$4.00 – $7.9225Mar 25, 2026, Open bid tab, T5878 ↗
Inlet Protection Systemeach$173.81$149.06 – $251.1324Aug 26, 2026, Open bid tab, T5890 ↗
Concrete Curb & Gutter, Type Flinear foot$60.36$48.09 – $80.9424Aug 26, 2026, Open bid tab, T5890 ↗
Detectable Warningssquare foot$37.95$32.21 – $54.0523Aug 26, 2026, Open bid tab, T5890 ↗
Aluminum signal pole, pedestaleach$2,691$2,175 – $3,01423Aug 26, 2026, Open bid tab, T5890 ↗
Traffic Control Officerhour$108.00$87.41 – $115.5023Aug 26, 2026, Open bid tab, T5890 ↗
Fiber Optic Cable Locatorday$224.00$168.00 – $269.0023Aug 26, 2026, Open bid tab, T5890 ↗
Itsfm Subsurfacemile$3,850$2,300 – $8,13623Aug 26, 2026, Open bid tab, T5890 ↗
Performance Turf, Sodsquare yard$10.00$5.75 – $27.5223Aug 26, 2026, Open bid tab, T5890 ↗
Pipe Culvert,Optionallinear foot$288.74$181.57 – $533.0322Aug 26, 2026, Open bid tab, T5890 ↗
Thermoplastic, Preformedeach$245.00$172.00 – $380.0022Aug 26, 2026, Open bid tab, T5890 ↗
Pull & splice box, f&i, 24 inch x 36 incheach$2,858$2,538 – $3,25922Aug 26, 2026, Open bid tab, T5890 ↗
Uninterruptible Power Supplyeach$10,526$9,415 – $12,90021Aug 26, 2026, Open bid tab, T5890 ↗
Signal Priority And Preemptioneach$9,120$7,651 – $9,80021Aug 26, 2026, Open bid tab, T5890 ↗
Pipe Culvert, Opt Materiallinear foot$707.36$319.00 – $968.8920Aug 26, 2026, Open bid tab, T5890 ↗
Thermoplastic, Standard, Whiteeach$150.00$105.00 – $193.7520Aug 26, 2026, Open bid tab, T5890 ↗
Concrete Sidewalk andsquare yard$95.12$85.00 – $117.7019Aug 26, 2026, Open bid tab, T5890 ↗
Steel Mast Arm Assembly, Furnisheach$74,355$63,789 – $93,08119Aug 26, 2026, Open bid tab, T5890 ↗
Pull & splice box, f&i, 13 inch x 24 incheach$1,750$1,531 – $2,20218Aug 26, 2026, Open bid tab, T5890 ↗
Raised Pavement Marker, Type Beach$5.12$5.00 – $5.6918Aug 26, 2026, Open bid tab, T5890 ↗
Fiber Optic Cable, F&Ilinear foot$4.45$3.50 – $6.0017Aug 26, 2026, Open bid tab, T5890 ↗
Conduit, Furnish & Install, Openlinear foot$22.22$18.60 – $28.5817Aug 26, 2026, Open bid tab, T5890 ↗
Fiber Optic Connection, Installeach$56.50$51.56 – $81.2514Aug 26, 2026, Open bid tab, T5890 ↗
Paint pavement markingeach$77.00$63.00 – $115.0013Aug 26, 2026, Open bid tab, T5890 ↗
Internally Illuminated Signeach$7,416$4,274 – $8,10013Aug 26, 2026, Open bid tab, T5890 ↗
Thermoplastic, Preformedlinear foot$19.50$15.00 – $22.6313Aug 26, 2026, Open bid tab, T5890 ↗
Asphalt Concrete Frictionton$258.50$207.57 – $285.7512Aug 26, 2026, Open bid tab, T5890 ↗
Pedestrian Detector, Furnish &each$1,134$534.45 – $1,67112Aug 26, 2026, Open bid tab, T5890 ↗