| Vehicle Detection System | each | $11,156 | $7,957 – $12,400 | 33 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Electrical Service Wire, Furnish | linear foot | $8.00 | $6.33 – $12.00 | 29 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Itsfm Location Documentation | each | $1,700 | $1,500 – $2,300 | 29 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Conduit, Furnish & Install | linear foot | $39.70 | $33.10 – $42.75 | 28 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Prestressed Concrete Pole, F&I | each | $2,271 | $1,784 – $2,864 | 28 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Standard, White | linear foot | $7.00 | $5.07 – $9.30 | 28 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Paint pavement marking | linear foot | $3.00 | $2.56 – $4.40 | 26 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Sign Panel, Furnish & Install | each | $978.80 | $811.31 – $1,446 | 26 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Milling Existing Asphalt | square yard | $4.15 | $2.75 – $12.75 | 26 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Remove of existing concrete | square yard | $41.28 | $31.48 – $62.31 | 26 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Paint pavement marking | square foot | $5.40 | $4.00 – $7.92 | 25 | Mar 25, 2026, Open bid tab, T5878 ↗ |
| Inlet Protection System | each | $173.81 | $149.06 – $251.13 | 24 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $60.36 | $48.09 – $80.94 | 24 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Detectable Warnings | square foot | $37.95 | $32.21 – $54.05 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Aluminum signal pole, pedestal | each | $2,691 | $2,175 – $3,014 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Traffic Control Officer | hour | $108.00 | $87.41 – $115.50 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Fiber Optic Cable Locator | day | $224.00 | $168.00 – $269.00 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Itsfm Subsurface | mile | $3,850 | $2,300 – $8,136 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Performance Turf, Sod | square yard | $10.00 | $5.75 – $27.52 | 23 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pipe Culvert,Optional | linear foot | $288.74 | $181.57 – $533.03 | 22 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Preformed | each | $245.00 | $172.00 – $380.00 | 22 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pull & splice box, f&i, 24 inch x 36 inch | each | $2,858 | $2,538 – $3,259 | 22 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Uninterruptible Power Supply | each | $10,526 | $9,415 – $12,900 | 21 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Signal Priority And Preemption | each | $9,120 | $7,651 – $9,800 | 21 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pipe Culvert, Opt Material | linear foot | $707.36 | $319.00 – $968.89 | 20 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Standard, White | each | $150.00 | $105.00 – $193.75 | 20 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Concrete Sidewalk and | square yard | $95.12 | $85.00 – $117.70 | 19 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $74,355 | $63,789 – $93,081 | 19 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,750 | $1,531 – $2,202 | 18 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Raised Pavement Marker, Type B | each | $5.12 | $5.00 – $5.69 | 18 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Fiber Optic Cable, F&I | linear foot | $4.45 | $3.50 – $6.00 | 17 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $22.22 | $18.60 – $28.58 | 17 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Fiber Optic Connection, Install | each | $56.50 | $51.56 – $81.25 | 14 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Paint pavement marking | each | $77.00 | $63.00 – $115.00 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Internally Illuminated Sign | each | $7,416 | $4,274 – $8,100 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Thermoplastic, Preformed | linear foot | $19.50 | $15.00 – $22.63 | 13 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Asphalt Concrete Friction | ton | $258.50 | $207.57 – $285.75 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |
| Pedestrian Detector, Furnish & | each | $1,134 | $534.45 – $1,671 | 12 | Aug 26, 2026, Open bid tab, T5890 ↗ |