| Paint pavement marking | linear foot | $2.45 | $1.81 – $3.00 | 94 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Standard, White | linear foot | $6.00 | $5.00 – $9.00 | 92 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Milling Existing Asphalt | square yard | $5.00 | $3.10 – $6.97 | 91 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Raised Pavement Marker, Type B | each | $5.20 | $5.00 – $6.50 | 65 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Standard, White | each | $135.00 | $93.00 – $184.00 | 57 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Preformed | each | $228.00 | $156.00 – $331.25 | 48 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Concrete Sidewalk and | square yard | $91.62 | $72.70 – $117.25 | 46 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Paint pavement marking | each | $60.00 | $49.00 – $85.00 | 45 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail Transition Connection | each | $3,500 | $2,998 – $4,050 | 39 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Asphalt Concrete Friction | ton | $225.44 | $200.84 – $264.60 | 37 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Prestressed Concrete Pole, F&I | each | $2,222 | $1,806 – $3,000 | 35 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Conduit, Furnish & Install | linear foot | $35.70 | $28.03 – $49.00 | 34 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Conduit, Furnish & Install, Open | linear foot | $23.75 | $17.00 – $32.00 | 33 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Temporary Barrier, Relocate | linear foot | $15.00 | $12.00 – $17.50 | 33 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Litter remove | acre | $130.85 | $95.00 – $250.00 | 33 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Mowing | acre | $213.85 | $112.50 – $354.09 | 32 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pull & splice box, f&i, 13 inch x 24 inch | each | $1,572 | $1,438 – $1,735 | 32 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Electrical Service Wire, Furnish | linear foot | $9.35 | $7.08 – $11.54 | 31 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Inlet Protection System | each | $188.50 | $126.25 – $223.75 | 30 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Embankment | cubic yard | $57.95 | $32.25 – $99.59 | 30 | Jun 10, 2026, Open bid tab, T2A47 ↗ |
| Remove of existing concrete | square yard | $51.00 | $37.07 – $87.50 | 30 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Superpave asphalt concrete | ton | $203.45 | $182.75 – $241.44 | 30 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Performance Turf, Sod | square yard | $8.93 | $4.41 – $18.75 | 30 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Vehicle Detection System | each | $12,500 | $10,530 – $22,858 | 29 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Managed Field Ethernet Switch | each | $4,207 | $3,458 – $5,000 | 29 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Optional Base, Base Group 09 | square yard | $80.78 | $59.00 – $125.00 | 29 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Thermoplastic, Standard | linear foot | $6.00 | $5.42 – $7.00 | 28 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Thermoplastic, Preformed | linear foot | $15.00 | $14.00 – $20.00 | 28 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Electrical Service Disconnect | each | $1,484 | $1,150 – $2,022 | 28 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Concrete Curb & Gutter, Type E | linear foot | $68.00 | $48.75 – $78.50 | 28 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail -Roadway, General TL-3 | linear foot | $28.35 | $25.70 – $32.08 | 27 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Traffic Control Officer | hour | $105.00 | $98.50 – $125.44 | 27 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Miscellaneous Asphalt Pavement | ton | $550.57 | $360.53 – $700.00 | 26 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Temporary Barrier, F&I, Low | linear foot | $48.65 | $37.85 – $55.00 | 25 | Jan 28, 2026, Open bid tab, T2A54 ↗ |
| Fiber Optic Cable Locator | day | $270.00 | $158.90 – $354.58 | 25 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Detectable Warnings | square foot | $45.00 | $40.39 – $57.60 | 24 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pipe Culvert,Optional | linear foot | $334.00 | $203.25 – $750.00 | 24 | Jan 28, 2026, Open bid tab, T2A56 ↗ |
| Concrete Curb & Gutter, Type F | linear foot | $65.50 | $51.75 – $78.50 | 24 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pull & splice box, f&i, 24 inch x 36 inch | each | $2,720 | $2,533 – $3,020 | 23 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Sediment Barrier | linear foot | $3.00 | $1.35 – $4.50 | 23 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pipe Culvert, Opt Material | linear foot | $450.00 | $250.00 – $1,092 | 21 | Jan 28, 2026, Open bid tab, T2A56 ↗ |
| Paint pavement marking | square foot | $6.30 | $5.00 – $10.00 | 21 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Pipe Culvert, Optional Material | linear foot | $250.00 | $170.00 – $500.00 | 21 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pedestrian Detector, Furnish & | each | $420.00 | $346.43 – $500.00 | 21 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Tubular marker, durable, 36 inch | each | $205.00 | $200.00 – $258.75 | 21 | May 22, 2024, Open bid tab, T2979 ↗ |
| Business Sign | each | $45.00 | $30.00 – $50.42 | 21 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Loop Detector Inductive, F&I, | each | $436.00 | $367.63 – $477.50 | 20 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Sign Panel, Remove, up to 12 SF | each | $75.00 | $50.00 – $127.50 | 19 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Steel Mast Arm Assembly, Furnish | each | $81,200 | $75,000 – $90,488 | 19 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Manhole, Adjust | each | $1,900 | $1,555 – $2,050 | 19 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Valve Boxes, Adjust | each | $1,312 | $1,125 – $1,700 | 19 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail End Treatment | each | $3,275 | $3,050 – $4,240 | 18 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Object Marker, Type 1 | each | $269.38 | $242.50 – $296.25 | 18 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Aluminum signal pole, pedestal | each | $3,008 | $2,727 – $3,500 | 17 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Retroreflective Sign Strip | each | $95.00 | $80.00 – $110.00 | 17 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Manhole, Adjust, Utilities | each | $1,800 | $1,574 – $2,000 | 17 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Pedestrian Detector, Remove | each | $100.47 | $65.00 – $157.53 | 16 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Fiber Optic Connection, Install | each | $81.00 | $61.55 – $91.20 | 15 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Aluminum signal pole, furnish & | each | $2,800 | $2,262 – $3,050 | 15 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Type B Stabilization | square yard | $35.93 | $31.25 – $88.80 | 15 | Jul 29, 2026, Open bid tab, T2A29 ↗ |
| Aluminum signal pole, remove | each | $610.00 | $450.16 – $940.00 | 14 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Internally Illuminated Sign | each | $6,424 | $5,264 – $7,300 | 14 | Jan 28, 2026, Open bid tab, T2A56 ↗ |
| Thermoplastic, Remove Existing | square foot | $5.25 | $3.62 – $10.03 | 14 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Borrow Excavation, Truck | cubic yard | $60.00 | $50.00 – $86.00 | 13 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Fiber Optic Cable, F&I | linear foot | $4.19 | $4.00 – $5.53 | 13 | Mar 25, 2026, Open bid tab, T2A65 ↗ |
| Regular Excavation | cubic yard | $48.00 | $41.00 – $75.00 | 13 | Jun 10, 2026, Open bid tab, T2A47 ↗ |
| Traffic Separator Concrete | linear foot | $83.24 | $54.84 – $177.50 | 12 | Mar 25, 2026, Open bid tab, T2963 ↗ |
| Mitered End Section, Optional | each | $3,750 | $3,146 – $5,000 | 12 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Guardrail remove | linear foot | $3.30 | $2.50 – $10.35 | 12 | Aug 26, 2026, Open bid tab, T2A78 ↗ |
| Delineator, Flexible Tubular | each | $130.00 | $107.75 – $150.00 | 12 | Jul 29, 2026, Open bid tab, T2A29 ↗ |