ItemPerMedianMiddle halfWinning bidsLatest source document
Pavement stripe-wb paint-4 in ymile$557.50$515.00 – $590.0072Feb 19, 2026, Open bid tab, contract 26-2002
Pavement stripe-wb paint-4 in wmile$515.00$480.00 – $550.0071Feb 19, 2026, Open bid tab, contract 26-2002
Concrete-class acubic yard$1,050$893.85 – $1,13358Jul 20, 2023, Open bid tab, contract 23-6003
Armored Edge for Concretelinear foot$123.50$87.00 – $178.7554May 25, 2023, Open bid tab, contract 23-5404
Steel reinforcedpound$2.00$1.63 – $2.5047Mar 23, 2023, Open bid tab, contract 23-7004
Steel reinforced-epoxy coatedpound$2.10$1.89 – $2.6046May 25, 2023, Open bid tab, contract 23-5404
Temporary signsquare foot$9.00$7.75 – $16.2746Oct 23, 2025, Open bid tab, contract 25-4507
Barcode Sign Inventoryeach$30.00$20.00 – $39.8642Jan 29, 2026, Open bid tab, contract 26-4501
DGA Baseton$54.00$45.00 – $70.0041May 25, 2023, Open bid tab, contract 23-5404
Concrete-class AAcubic yard$2,050$1,100 – $2,63441May 25, 2023, Open bid tab, contract 23-5404
Arrow Paneleach$1,000$500.00 – $1,25041Oct 23, 2025, Open bid tab, contract 25-4507
Concrete sealsquare foot$5.00$2.74 – $5.0040May 25, 2023, Open bid tab, contract 23-5404
Law Enforcement Officerhour$110.00$100.00 – $110.0039Feb 19, 2026, Open bid tab, contract 26-2002
Pavement stripe-wb paint-6 in ymile$790.00$735.00 – $878.7538Feb 19, 2026, Open bid tab, contract 26-2002
Pavement stripe-temporary remove tape-wlinear foot$1.00$0.93 – $1.4037May 25, 2023, Open bid tab, contract 23-1322
Pavement stripe-wb paint-6 in wmile$750.00$680.00 – $828.7536Feb 19, 2026, Open bid tab, contract 26-2002
Steel Post Type 1linear foot$25.00$20.00 – $28.2836Jan 29, 2026, Open bid tab, contract 26-4501
Delineator for Guardrail BI Directional Whiteeach$15.00$12.48 – $15.0036May 25, 2023, Open bid tab, contract 23-5404
Portable Changeable Message Signeach$2,226$900.00 – $3,18035May 25, 2023, Open bid tab, contract 23-5404
Guardrail Terminal Section NO 1each$100.00$75.00 – $150.0035May 25, 2023, Open bid tab, contract 23-5404
Water Blasting Existing Stripelinear foot$3.00$3.00 – $3.0035Feb 19, 2026, Open bid tab, contract 26-2002
Remove Signeach$100.00$72.33 – $150.0034Jan 29, 2026, Open bid tab, contract 26-4501
Cyclopean Stone Rip Rapton$59.88$42.75 – $72.2534May 25, 2023, Open bid tab, contract 23-5404
Pavement stripe-temporary remove tape-blinear foot$2.00$1.58 – $2.0034May 25, 2023, Open bid tab, contract 23-1322
Asphalt Seal Coatton$1,500$1,052 – $4,23134May 25, 2023, Open bid tab, contract 23-5404
Sbm aluminum sheet sign.125 insquare foot$35.00$32.45 – $40.2034Jan 29, 2026, Open bid tab, contract 26-4501
Test Pileslinear foot$204.33$158.00 – $310.0033May 25, 2023, Open bid tab, contract 23-5404
Sbm aluminum sheet sign.080 insquare foot$35.68$34.25 – $41.3332Jan 29, 2026, Open bid tab, contract 26-4501
Roadway Excavationcubic yard$46.93$37.45 – $77.5031May 25, 2023, Open bid tab, contract 23-5404
Structure Granular Backfillcubic yard$91.10$71.62 – $104.5031Mar 23, 2023, Open bid tab, contract 23-7004
Pavement marking-thermoplastic stop bar-24inlinear foot$15.90$14.50 – $20.0031Dec 14, 2023, Open bid tab, contract 23-4012
Pavement stripe-permanent paint-4 inlinear foot$1.75$0.488 – $2.0030May 25, 2023, Open bid tab, contract 23-5404
Gmss Type Deach$1,000$712.50 – $1,00030Dec 14, 2023, Open bid tab, contract 23-4009
Maintenance Fertilizerton$1,500$1,500 – $2,00029May 25, 2023, Open bid tab, contract 23-1322
Temporary. silt fencelinear foot$3.00$2.00 – $5.0029Jul 20, 2023, Open bid tab, contract 23-6003
Temporary mulchingsquare yard$0.25$0.25 – $1.2529May 25, 2023, Open bid tab, contract 23-1322
Class2 asphalt surface 0.38d pg64-22ton$299.36$175.00 – $755.2428May 25, 2023, Open bid tab, contract 23-5404
Silt Trap Type Beach$379.40$234.12 – $483.4128Jul 20, 2023, Open bid tab, contract 23-6003
Temporary signal 2 phaseeach$5,000$3,700 – $5,35028Mar 23, 2023, Open bid tab, contract 23-7004
Initial Fertilizerton$1,500$1,500 – $1,80028May 25, 2023, Open bid tab, contract 23-1322
Agricultural Limestoneton$120.00$100.00 – $500.0026Mar 23, 2023, Open bid tab, contract 23-7004
Durable Waterborne MARKING-6 in Wmile$1,198$1,012 – $1,31526Feb 19, 2026, Open bid tab, contract 26-2002
Durable Waterborne MARKING-6 in Ymile$1,300$1,100 – $1,40026Feb 19, 2026, Open bid tab, contract 26-2002
Asphalt Material for Tack Non-trackington$758.31$636.00 – $973.6525May 25, 2023, Open bid tab, contract 23-1322
Edge Keylinear foot$59.38$35.00 – $64.0025Jul 20, 2023, Open bid tab, contract 23-6003
Silt Trap Type Aeach$250.00$140.30 – $350.0025May 25, 2023, Open bid tab, contract 23-1322
Erosion Control Blanketsquare yard$3.10$2.26 – $5.0025Jul 20, 2023, Open bid tab, contract 23-6003
Pavement stripe-thermoplastic-6 in ylinear foot$2.38$1.36 – $6.0024Dec 14, 2023, Open bid tab, contract 23-4009
Partial deep patchcubic yard$1,750$1,194 – $2,00024Feb 23, 2023, Open bid tab, contract 23-2962
Class2 asphalt base 1.00d pg64-22ton$183.92$130.00 – $383.3923May 25, 2023, Open bid tab, contract 23-5404
Guardrail-steel W Beam-s Facelinear foot$48.00$34.80 – $68.2823May 25, 2023, Open bid tab, contract 23-5404
Class a concrete for signcubic yard$1,200$1,000 – $1,35023Dec 14, 2023, Open bid tab, contract 23-4009
Remove Signal Equipmenteach$3,000$2,500 – $3,00023Mar 23, 2023, Open bid tab, contract 23-4409
Pre-drilling for Pileslinear foot$482.00$395.00 – $607.0023Mar 23, 2023, Open bid tab, contract 23-7004
Pavement marking-thermoplastic curv arroweach$130.00$125.00 – $150.0023Dec 14, 2023, Open bid tab, contract 23-4009
Fabric-geotextile Class 2square yard$3.00$3.00 – $3.9222Mar 23, 2023, Open bid tab, contract 23-1317
Inlaid Pavement Marker-b W/Reach$30.00$28.00 – $31.5021Aug 21, 2025, Open bid tab, contract 25-4001
Silt Trap Type Ceach$250.00$150.00 – $460.5021Jul 20, 2023, Open bid tab, contract 23-6003
Structure excavation-solid rockcubic yard$85.00$85.00 – $125.0021Mar 23, 2023, Open bid tab, contract 23-7005
Asphalt pavement milling & texturington$41.99$18.81 – $88.7520Jul 20, 2023, Open bid tab, contract 23-6003
Pavement stripe-thermoplastic-6 in wlinear foot$1.73$1.35 – $3.3820Dec 14, 2023, Open bid tab, contract 23-4012
Piezoelectric Sensoreach$3,200$3,200 – $3,20018Mar 26, 2026, Open bid tab, contract 26-1111
Trench and backfillinglinear foot$13.00$13.00 – $13.0018Mar 26, 2026, Open bid tab, contract 26-1111
CONDUIT-1 1/4 inlinear foot$7.17$7.17 – $7.1718Mar 26, 2026, Open bid tab, contract 26-1111
CONDUIT-2 inlinear foot$9.93$9.93 – $9.9318Mar 26, 2026, Open bid tab, contract 26-1111
Loop Wirelinear foot$0.3$0.3 – $0.318Mar 26, 2026, Open bid tab, contract 26-1111
Loop Saw Slot and Filllinear foot$37.18$37.18 – $37.1816Mar 26, 2026, Open bid tab, contract 26-1111
Electrical Junction Box Type Beach$1,800$1,800 – $1,80016Mar 26, 2026, Open bid tab, contract 26-1111
Electrical Junction Box Type Aeach$2,800$2,800 – $2,80015Mar 26, 2026, Open bid tab, contract 26-1111