Street Lighting · awarded bid prices · El Paso County
Conduit (pvc) (sch 40) (2 inch): cost per linear foot in El Paso County, TX
Listed by the agency as “Condt (PVC) (Sch 40) (2")”.
The median awarded price is $21.00 per linear foot, from 17 winning bids on 17 public projects in El Paso County, TX (2024–2026). Half of the awarded prices fall between $18.50 and $29.00.
Cost by state › Texas › El Paso County › Condt (PVC) (Sch 40) (2")
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $16.20 in 2020 to $23.63 in 2025 (+46%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2020 | $16.20 | 7 |
| 2021 | $20.60 | 8 |
| 2022 | $31.00 | 9 |
| 2023 | $20.00 | 9 |
| 2024 | $25.00 | 9 |
| 2025 | $23.63 | 5 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Aug 6, 2026 | TxDOT | 28040 LF | $13.35 | line 29 ↗ |
| Jun 3, 2026 | TxDOT | 17955 LF | $20.00 | line 158 ↗ |
| May 6, 2026 | TxDOT | 14650 LF | $15.75 | line 10 ↗ |
| Jul 2, 2025 | TxDOT | 650 LF | $24.83 | line 31 ↗ |
| Jul 2, 2025 | TxDOT | 6630 LF | $21.00 | line 93 ↗ |
The same item across Texas: statewide figures. See every awarded price for this item on the Condt (PVC) (Sch 40) (2") item page.
Related items in El Paso County
- Elec Condr (NO.6) Insulated: $3.15 per linear foot
- Ground Box TY A (122311)W/Apron: $1,550 per each
- Condt (PVC) (Sch 40) (2") (Bore): $32.00 per linear foot
- Conduit (Prepare): $4.71 per linear foot
- Ground Box (Prepare): $595.00 per each
- Elec Condr (NO.8) Insulated: $2.88 per linear foot