Street Lighting · awarded bid prices · Bexar County
Electrical conductor (no.8) bare: cost per linear foot in Bexar County, TX
Listed by the agency as “Elec Condr (NO.8) Bare”.
The median awarded price is $1.85 per linear foot, from 23 winning bids on 23 public projects in Bexar County, TX (2024–2026). Half of the awarded prices fall between $1.60 and $2.00.
Cost by state › Texas › Bexar County › Elec Condr (NO.8) Bare
Winning bids only, as printed in the agencies' bid tabulations (TxDOT). The county is the one the agency recorded for the project. These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $1.17 in 2019 to $1.69 in 2026 (+45%).
| Year | Median per linear foot | Winning bids |
|---|---|---|
| 2019 | $1.17 | 6 |
| 2021 | $1.29 | 6 |
| 2023 | $1.40 | 5 |
| 2024 | $1.95 | 8 |
| 2025 | $2.00 | 7 |
| 2026 | $1.69 | 8 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Aug 5, 2026 | TxDOT | 1345 LF | $1.60 | line 13 ↗ |
| Jul 1, 2026 | TxDOT | 5865 LF | $1.25 | line 18 ↗ |
| Jul 1, 2026 | TxDOT | 13437 LF | $1.74 | line 250 ↗ |
| May 7, 2026 | TxDOT | 31245 LF | $1.55 | line 244 ↗ |
| May 6, 2026 | TxDOT | 1115 LF | $1.75 | line 180 ↗ |
The same item across Texas: statewide figures. See every awarded price for this item on the Elec Condr (NO.8) Bare item page.
Related items in Bexar County
- Condt (PVC) (Sch 80) (2") (Bore): $28.00 per linear foot
- Elec Condr (NO.6) Insulated: $2.31 per linear foot
- Condt (PVC) (Sch 80) (2"): $20.00 per linear foot
- Elec Condr (NO.6) Bare: $2.00 per linear foot
- Ground Box TY D (162922)W/Apron: $1,610 per each
- Condt (PVC) (Sch 80) (3"): $25.50 per linear foot
- Condt (PVC) (Sch 80) (3") (Bore): $34.50 per linear foot
- VEH Sig Sec (12")LED(YEL): $285.00 per each