| Construction Sign, Type A | each | $195.00 | $142.70 – $235.00 | 39 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Construction Sign, Type B | each | $98.00 | $80.00 – $114.00 | 31 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Barricade, Type Iii-a | linear foot | $16.50 | $14.00 – $20.50 | 28 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Temporary Pavement Marking, Removable, 4 IN. | linear foot | $1.48 | $1.33 – $1.60 | 26 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Road Closure Sign Assembly | each | $280.00 | $232.50 – $395.00 | 24 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Construction Sign, a | each | $228.32 | $189.00 – $308.25 | 24 | May 10, 2023, May 10, 2023 letting ↗ |
| Signal Cable, Control, Copper, 5C/14 Gauge | linear foot | $4.00 | $3.48 – $5.00 | 24 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Transverse Marking, Thermoplastic, Crosswalk Line, White, 24 IN. | linear foot | $10.00 | $8.30 – $12.12 | 23 | Feb 26, 2025, Feb 26, 2025 letting ↗ |
| Bridge deck patch, partial deep | square foot | $1.00 | $1.00 – $4.00 | 22 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Pedestrian Push Button, Aps | each | $1,300 | $1,169 – $1,540 | 22 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Temporary Traffic Barrier, Type 2 | linear foot | $44.98 | $26.94 – $65.48 | 22 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Flashing Arrow Sign | day | $18.00 | $14.00 – $30.00 | 21 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Signal Cable, Roadway Loop, Copper, 1C/14 Gauge | linear foot | $1.00 | $0.75 – $1.50 | 21 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Guardrail, MGS W-beam, 6 FT 3 IN. Spacing | linear foot | $25.00 | $23.90 – $28.12 | 20 | Dec 10, 2025, Dec 10, 2025 letting ↗ |
| Saw cut for roadway loop detector and seal | linear foot | $15.12 | $12.00 – $21.32 | 20 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Pipe, Remove | linear foot | $37.20 | $24.53 – $47.61 | 20 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Conduit, Steel, Galvanized, 2 IN. | linear foot | $47.15 | $32.21 – $59.51 | 20 | Dec 10, 2025, Dec 10, 2025 letting ↗ |
| Line, Thermoplastic, Solid, Yellow, 4 IN. | linear foot | $0.9 | $0.738 – $1.29 | 20 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Snowplowable Raised Pavement Marker | each | $55.00 | $37.25 – $82.25 | 20 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Joint Adhesive, Surface | linear foot | $1.00 | $0.5 – $1.46 | 19 | Mar 12, 2025, Mar 12, 2025 letting ↗ |
| Detour Route Marker Assembly | each | $110.00 | $80.00 – $228.00 | 19 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Sign, Sheet, With Legend, 0.080 IN. | square foot | $35.20 | $30.00 – $51.00 | 19 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Riprap, Revetment | ton | $90.00 | $66.84 – $135.00 | 19 | Feb 11, 2026, Feb 11, 2026 letting ↗ |
| Joint Adhesive, Intermediate | linear foot | $0.89 | $0.502 – $1.21 | 18 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Curb, Concrete | linear foot | $68.32 | $43.70 – $137.50 | 18 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Pipe, Type 2, Circular, Diameter 12 IN. | linear foot | $90.00 | $75.00 – $115.00 | 17 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Portable Changeable Message Sign | each | $4,675 | $3,500 – $6,500 | 17 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Temporary Pavement Marking, Removable, 6 IN. | linear foot | $2.25 | $2.00 – $2.95 | 17 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Line, Remove | linear foot | $0.75 | $0.597 – $1.23 | 16 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Energy Absorbing Terminal, Cz, TL-3 | each | $6,902 | $5,999 – $10,120 | 16 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Truck Mounted Attenuator | day | $1,200 | $575.00 – $1,681 | 16 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Grooving for pavement marking | linear foot | $0.75 | $0.445 – $0.95 | 15 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Sign Post, Square, Type 1, Reinforced Anchor Base | linear foot | $36.50 | $30.00 – $40.10 | 15 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Guardrail, Remove | linear foot | $5.00 | $4.25 – $8.05 | 14 | Dec 10, 2025, Dec 10, 2025 letting ↗ |
| Computer System Equipment | each | $1,292 | $1,000 – $1,698 | 14 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Transverse Marking, Thermoplastic, Stop Line, White, 24 IN. | linear foot | $10.62 | $9.46 – $13.80 | 14 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Casting, Inlet, Adjust to Grade | each | $1,033 | $718.75 – $1,142 | 14 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| D-1 Contraction Joint | linear foot | $20.00 | $16.00 – $35.59 | 13 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Sign, Sheet, With Legend, 0.100 IN. | square foot | $35.00 | $32.00 – $47.72 | 13 | Aug 6, 2025, Aug 6, 2025 letting ↗ |
| Curb AND Gutter, Concrete | linear foot | $45.00 | $31.00 – $60.00 | 13 | Mar 11, 2026, Mar 11, 2026 letting ↗ |
| Law Enforcement Officer | hour | $60.00 | $60.00 – $60.00 | 13 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Casting, Manhole, Adjust to Grade | each | $1,100 | $824.21 – $1,366 | 13 | Feb 11, 2026, Feb 11, 2026 letting ↗ |
| Compaction aggregate no. 53 | ton | $50.95 | $46.69 – $75.81 | 12 | Jan 14, 2026, Jan 14, 2026 letting ↗ |
| Field Drilled Hole in Concrete | each | $22.00 | $18.14 – $46.49 | 12 | Apr 15, 2026, Apr 15, 2026 letting ↗ |
| Reinforced bars, epoxy coated | pound | $1.54 | $1.50 – $1.89 | 12 | Apr 15, 2026, Apr 15, 2026 letting ↗ |