Other · awarded bid prices
Flash arrow panel (c type): cost per each in Colorado
Listed by the agency as “Flash Arrow Panel (C TY)”.
The median awarded price is $1,800 per each, from 159 winning bids on 159 public projects in Colorado (2023–2026). Half of the awarded prices fall between $1,000 and $2,896.
Cost by state › Colorado › Flash Arrow Panel (C TY)
Winning bids only, as printed in the agencies' bid tabulations (CDOT). These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.
Trend
The median awarded price went from $1,580 in 2021 to $1,200 in 2026 (-24%).
| Year | Median per each | Winning bids |
|---|---|---|
| 2021 | $1,580 | 59 |
| 2022 | $2,000 | 63 |
| 2023 | $2,300 | 50 |
| 2024 | $1,741 | 54 |
| 2025 | $2,120 | 49 |
| 2026 | $1,200 | 45 |
Most recent source documents
| Letting | Agency | Quantity | Awarded unit price | Source |
|---|---|---|---|---|
| Oct 22, 2026 | CDOT | 4 Each | $1,500 | CDOT cost lookup · contract C24185 ↗ |
| Oct 22, 2026 | CDOT | 2 Each | $654.00 | CDOT cost lookup · contract C25453 ↗ |
| Oct 15, 2026 | CDOT | 2 Each | $250.00 | CDOT cost lookup · contract C27332 ↗ |
| Oct 9, 2026 | CDOT | 2 Each | $1,400 | CDOT cost lookup · contract C27751 ↗ |
| Oct 8, 2026 | CDOT | 2 Each | $2,500 | CDOT cost lookup · contract C26435R ↗ |
See every awarded price for this item, in all states, on the Flash Arrow Panel (C TY) item page.
Related items in Colorado
- Flagging: $46.00 per hour
- Port Mesg Panel: $7,140 per each
- Potholing: $350.00 per hour
- REM Trash: $100.00 per hour
- Mycorrhizae: $18.72 per pound
- MOD Epoxy Pvmt MKG: $170.50 per gallon
- Pre-fab Vehicle Track Pad: $5,000 per each
- Vert Panel: $37.00 per each
Free account: new awarded prices for this item show on your watchlist.