| Mobilization | ls | 20,613 | — | $29,375 | $0.001 – $88,900,000 | Nov 12, 2026, line 16 ↗ |
| Barricade, sign and traffic handling | month | 16,931 | $3,000 | $5,000 | $0.001 – $500,000 | Nov 12, 2026, line 7 ↗ |
| Reflective pavement marker type ii-a-a | each | 8,489 | $4.00 | $7.00 | $0.04 – $1,270 | Nov 4, 2026, line 86 ↗ |
| Vegetative Watering | thousand gallons | 7,693 | $20.00 | $400.00 | $0.001 – $378,675 | Mar 4, 2025, line 3 ↗ |
| TMA (Stationary) | day | 7,390 | — | $200.80 | $0.01 – $16,487 | Nov 12, 2026, line 7 ↗ |
| Portable Changeable Message Sign | day | 5,752 | $100.00 | $33.13 | $0.001 – $7,870 | Nov 12, 2026, line 6 ↗ |
| Reflective pavement marker type i-c | each | 5,370 | $4.00 | $7.00 | $0.04 – $675.00 | Nov 4, 2026, line 85 ↗ |
| Temporary sediment control fence (remove) | linear foot | 5,169 | $1.00 | $1.00 | $0.01 – $200.00 | Nov 12, 2026, line 22 ↗ |
| Temporary sediment control fence (install) | linear foot | 5,169 | $3.50 | $3.00 | $0.01 – $387.00 | Nov 12, 2026, line 21 ↗ |
| Preparing right of way | station | 5,060 | — | $1,160 | $0.01 – $572,858 | Nov 4, 2026, line 1 ↗ |
| Guardrail End Treatment (Install) | each | 5,011 | $2,700 | $4,935 | $1.00 – $10,659 | Nov 12, 2026, line 24 ↗ |
| Remove small road sign support&assembly | each | 4,980 | $100.00 | $75.00 | $0.001 – $3,850 | Nov 4, 2026, line 65 ↗ |
| Reflective pavement marking type i (w)8 inch(solid)(100mil) | linear foot | 4,824 | $0.97 | $0.9 | $0.01 – $34.45 | Nov 4, 2026, line 113 ↗ |
| Rock Filter Dams (Remove) | linear foot | 4,747 | $10.00 | $25.00 | $0.01 – $5,000 | Nov 12, 2026, line 20 ↗ |
| Metal w-beam guard fence (timber post) | linear foot | 4,660 | $22.00 | $29.70 | $0.05 – $638.22 | Nov 4, 2026, line 47 ↗ |
| Reflective pavement marking type i (w)24 inch(solid)(100mil) | linear foot | 4,632 | $6.50 | $6.70 | $0.45 – $510.00 | Nov 4, 2026, line 114 ↗ |
| Excavation (Roadway) | cubic yard | 4,620 | $12.50 | $12.80 | $0.01 – $1,070 | Feb 7, 2025, line 14 ↗ |
| Wk zn pavement marking sht terminal (tab)type y-2 | each | 4,614 | $1.01 | $5.76 | $0.01 – $110.00 | Nov 12, 2026, line 27 ↗ |
| Reflective pavement marker type ii-c-r | each | 4,442 | $4.00 | $4.20 | $0.04 – $630.00 | Nov 4, 2026, line 288 ↗ |
| Portable Changeable Message Sign | each | 4,236 | $8,800 | $12,925 | $0.01 – $81,880 | Nov 12, 2026, line 18 ↗ |
| Cement stabilized backfill | cubic yard | 4,190 | $133.37 | $250.00 | $0.01 – $2,200 | Nov 12, 2026, line 6 ↗ |
| Riprap (Mow Strip)(4 in) | cubic yard | 4,021 | $507.55 | $700.00 | $0.01 – $5,000 | Nov 12, 2026, line 10 ↗ |
| Biodegradable erosion control logs (remove) | linear foot | 3,988 | $1.20 | $1.10 | $0.01 – $100.00 | Nov 4, 2026, line 40 ↗ |
| In small road sign support&assembly type10bwg(1)sa(p) | each | 3,846 | $575.00 | $1,369 | $3.65 – $4,400 | Nov 4, 2026, line 60 ↗ |
| Wk zn pavement marking sht terminal (tab)type w | each | 3,845 | $1.00 | $5.64 | $0.01 – $116.91 | Nov 12, 2026, line 26 ↗ |
| Elim ext pavement marking & mrks (4 inch) | linear foot | 3,837 | $0.56 | $0.58 | $0.01 – $200.00 | Feb 7, 2025, line 444 ↗ |
| Metal beam guard fence transition (thrie-beam) | each | 3,676 | $1,750 | $1,914 | $1.00 – $8,850 | Nov 4, 2026, line 49 ↗ |
| Rc pipe (class iii)(24 in) | linear foot | 3,352 | $80.00 | $98.00 | $20.00 – $3,500 | Nov 4, 2026, line 24 ↗ |
| Remove Metal Beam Guard Fence | linear foot | 3,341 | $3.00 | $3.63 | $0.01 – $500.00 | Nov 4, 2026, line 55 ↗ |
| TMA (Mobile Operation) | day | 3,236 | — | $650.00 | $0.01 – $5,500 | Nov 17, 2026, line 1 ↗ |
| Construction Exits (Remove) | square yard | 3,210 | $8.00 | $19.00 | $0.01 – $500.00 | Nov 4, 2026, line 41 ↗ |
| Mobilization (Callout) | each | 3,176 | — | $1.00 | $0.001 – $535,000 | Nov 17, 2026, line 1 ↗ |
| Re pm w/ret req type i (y)4 inch(solid)(100mil) | linear foot | 3,118 | $0.41 | $0.5 | $0.15 – $40.00 | Aug 6, 2024, TxDOT request R075975-102926 · Bid_Tab_FY24 · let 2024-08-06 ↗ |
| In small road sign support&assembly type10bwg(1)sa(t) | each | 3,073 | $675.00 | $1,405 | $11.00 – $4,500 | Nov 4, 2026, line 62 ↗ |
| Guardrail End Treatment (Remove) | each | 3,003 | $250.00 | $1,762 | $1.00 – $7,500 | Nov 12, 2026, line 25 ↗ |
| Remove str (pipe) | linear foot | 2,968 | $17.36 | $150.00 | $1.00 – $3,730 | Nov 10, 2026, line 8 ↗ |
| Re pm w/ret req type i (w)4 inch(solid)(100mil) | linear foot | 2,921 | $0.4 | $3.78 | $0.16 – $25.00 | Nov 6, 2024, line 48 ↗ |
| Construction exits (install) (type 1) | square yard | 2,856 | $20.00 | $62.00 | $0.01 – $713.10 | Nov 4, 2026, line 40 ↗ |
| Rock filter dams (install) (type 2) | linear foot | 2,851 | $30.00 | $76.00 | $0.01 – $400.00 | Nov 4, 2026, line 38 ↗ |
| Rc pipe (class iii)(18 in) | linear foot | 2,837 | $62.00 | $84.00 | $15.00 – $1,275 | Nov 4, 2026, line 23 ↗ |