2,387 winning bid prices read from 85 source documents, 2018–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Santa Ana

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Unclassified Excavationcubic yard52$126.50$17.00$17.00 – $540.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Construction Permitls42$10,100$10,000$5,200 – $45,700Nov 10, 2025, Open bid tab, 24-6053 ↗
Signing and stripels37—$158,310$3,866 – $347,430Nov 20, 2024, Open bid tab, 25-6030 ↗
Project Advertisement Signeach37$2,000$2,300$750.00 – $5,000Aug 27, 2025, Open bid tab, 25-2604 ↗
PCC Curb Rampsquare foot28$18.50$49.00$5.25 – $68.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Ac Pavementton25$120.00$256.00$74.00 – $400.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Root Shave*each24$525.00$7,000$250.00 – $7,000Jun 4, 2024, Open bid tab, 22-9001 ↗
Labor Agreement Oversightls24$10,000$15,000$5,000 – $25,000Feb 2, 2021, Open bid tab, 14-6802, 18-6424, 20-6618 ↗
Pcc sidewalk (t=4 inch)square foot22$13.00$18.00$5.00 – $50.00Nov 20, 2024, Open bid tab, 25-6030 ↗
As-built Plansls18$5,000$2,500$2,500 – $50,000Jan 13, 2026, Open bid tab, 26-6012 ↗
Cold milling (2 inch)square foot17$0.35$0.7$0.17 – $5.00Jun 29, 2023, Open bid tab, 22-6989 ↗
PCC Curb and Gutter (Type A-2-8)*linear foot14$70.50$153.00$30.00 – $153.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Asphalt Rubber Hot Mix (ARHM)ton14$123.50$147.18$85.00 – $275.00Jul 3, 2024, Open bid tab, 23-6702 ↗
P.c.c. sidewalk, 4 inchsquare foot14$8.80$15.00$5.25 – $17.50Jun 26, 2023, Open bid tab, 21-6975 ↗
PCC Cross Gutter*square foot12$21.50$27.00$15.00 – $50.00Apr 18, 2023, Open bid tab, 23-7543 ↗
Install No. 6 Pull Boxeach11$1,000$1,275$700.00 – $1,300Nov 20, 2024, Open bid tab, 25-6030 ↗
Furnish and Install New #6 Pullboxeach9$1,060$1,320$543.00 – $2,360Jun 29, 2023, Open bid tab, 22-6989 ↗
Install 3 inch pvc conduit per planlinear foot9$56.00$60.00$40.00 – $76.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Install 2 inch pvc conduit per planlinear foot9$57.00$75.00$20.53 – $75.00Nov 20, 2024, Open bid tab, 25-6030 ↗
PCC Curb and Gutter (Type A-2-6)*linear foot9$72.00$80.00$48.00 – $231.00Jun 4, 2024, Open bid tab, 22-9001 ↗
Rubberized Emulsion Aggregate Slurry (REAS) Type IIton9$699.00$1,993$400.00 – $1,993May 2, 2023, Open bid tab, 22-6988 ↗
Irrigationls9$142,500$222,500$10,000 – $450,000Jul 10, 2024, Open bid tab, 20-2731 ↗
Clearing and Grubbingls9$30,000$82,500$10,000 – $150,000Jul 10, 2024, Open bid tab, 20-2731 ↗
Construction Permitsls8$9,250$7,000$4,680 – $16,500Jan 13, 2026, Open bid tab, 26-6012 ↗
Install No. 6E Pull Boxeach8$1,222$1,500$885.00 – $2,000Nov 20, 2024, Open bid tab, 25-6030 ↗
SWPPP (Risk Level 2)ls8$41,000$30,000$8,500 – $357,000Jun 26, 2024, Open bid tab, 22-1381 ↗
Adjust Sewer and Drainage Manhole to Finished Gradeeach8$1,125$1,550$750.00 – $1,550Jul 3, 2024, Open bid tab, 23-6702 ↗
Install 4” PVC Conduit per plan *linear foot8$80.41$95.00$50.00 – $111.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Adjust Water Valve Frame and Cover to Finished Gradeeach7$1,300$2,049$500.00 – $2,049Oct 17, 2023, Open bid tab, 22-1406 ↗
Pcc Curb, Type B1linear foot7$40.00$85.00$31.59 – $85.00Nov 20, 2024, Open bid tab, 25-6030 ↗
Asphalt Rubber Hot Mixton7$114.11$130.00$85.00 – $147.00Jun 4, 2024, Open bid tab, 22-9001 ↗
Asphalt Concreteton7$165.00$165.00$90.00 – $190.00Jun 29, 2023, Open bid tab, 22-6989 ↗
Crack sealls7$44,000$72,000$6,500 – $166,779Apr 18, 2023, Open bid tab, 23-6907 ↗
Project Advertising Sign(s)each6$943.50$550.00$550.00 – $1,780Nov 20, 2024, Open bid tab, 25-6030 ↗
Furnish and Install Traffic Loops Type E †each6$380.00$448.00$225.00 – $800.00Jul 3, 2024, Open bid tab, 23-6702 ↗
Remove of 6 inch pcc at various locationscubic yard6$149.00$172.00$56.00 – $172.00Apr 18, 2023, Open bid tab, 23-7543 ↗
Construct PCC Curb Ramp*square foot6$15.00$35.00$9.00 – $35.00Mar 28, 2023, Open bid tab, 22-1405 ↗
Construct pcc sidewalk (t=4 inch)*square foot6$8.00$10.50$5.00 – $10.50Jan 3, 2020, Open bid tab, 20-6956, 20-6437 ↗
PCC Driveway Approach (T=8”)square foot6$21.61$22.00$17.50 – $50.00Jul 3, 2024, Open bid tab, 23-6702 ↗
Protection of Surface Utility Frames and Coversls6—$50,000$952.00 – $50,000Oct 18, 2022, Open bid tab, 22-1341 ↗