Brazoria County Municipal Utility District No. 83: awarded unit prices

108 winning bid prices read from 2 source documents, 2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Brazoria County Municipal Utility District No. 83

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
36” Storm Sewer Cleanout And Video Inspection, Complete In Placelinear foot3—$3.50$3.50 – $39.16Sep 16, 2026, Open bid tab, 2791-3101 ↗
30” Storm Sewer Cleanout And Video Inspection, Complete In Placelinear foot3—$3.35$3.35Sep 16, 2026, Open bid tab, 2791-3101 ↗
24” Storm Sewer Cleanout And Video Inspection, Complete In Placelinear foot3—$3.35$3.35Sep 16, 2026, Open bid tab, 2791-3101 ↗
8” Sanitary Sewer Cleanout And Video Inspection, Complete In Placelinear foot3—$1.80$1.80Sep 16, 2026, Open bid tab, 2791-3101 ↗
Utility Spoils To Be Used On Site, Includes Stripping, Stockpiling Of Strippings, Placement, Compaction Of Materials To 95% Standard Proctor Density And Re-Application Of Strippings, Complete In Placecubic yard3—$2.00$2.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
42” Storm Sewer Cleanout And Video Inspection, Complete In Placelinear foot2—$4.95$4.95Sep 16, 2026, Open bid tab, 2791-3101 ↗
Trench Safety System, All Depths, Complete In Placelinear foot2—$1.05$1.05 – $1.10Nov 3, 2026, Open bid tab, 2791-4112 ↗
Hydromulch Seeding Of R.O.W. And Median (To Be Used Only At The Written Direction Of The Engineer), Complete In Placeacre1—$2,000$2,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Extra Sign, Complete In Placeeach1—$927.00$927.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Traffic control sign and post in accordance with the city of manvel standard sign detail, includes stop sign, street name sign with "no outlet" if needed, directional sign with supplements, etc., complete in placeeach1—$927.00$927.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Roadway And Lot Excavation To Be Used For Fill To Final Grade Within The Project Limits, Includes Stripping, Stockpiling Of Strippings, Haul, Placement And Compaction Of Materials To 95% Standard Proctor Density And Re-Application Of Strippings, Complete In Placecubic yard1—$3.65$3.65Nov 3, 2026, Open bid tab, 2791-4112 ↗
Complete Lot Grading (59 Lots, 6 Reserves) And Final Dressing Of All Areas, Complete In Placels1—$7,750$7,750Nov 3, 2026, Open bid tab, 2791-4112 ↗
Fly ash for 6 inch stabilized subgrade (6% fly ash by weight, 30 lbs/sy), as required by soil conditions, and approved by geotechnical engineer, complete in placeton1—$158.00$158.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Hydrated lime for 6 inch stabilized subgrade (8% lime by weight, 40 lbs/sy), as required by soil conditions, and approved by geotechnical engineer, complete in placeton1—$368.00$368.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Install And Maintain Reinforced Filter Fabric Fence, Complete In Placelinear foot1—$1.85$1.85Nov 3, 2026, Open bid tab, 2791-4112 ↗
Type iii inlet protection barriers for existing inlet, complete in placeeach1—$80.00$80.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Type ii inlet protection barriers for existing inlet, complete in placeeach1—$100.00$100.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Type iii inlet protection barriers for proposed inlet, complete in placeeach1—$80.00$80.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Type ii inlet protection barriers for proposed inlet, complete in placeeach1—$100.00$100.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Hydromulch Seeding And Fine Grading Of Lake Maintenance Berm Disturbed By Construction Of Storm Sewer Outfall, Complete In Placeacre1—$2,000$2,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Slope Stabilization Material (Pyramat 25 Or Approved Equivalent), Includes Topsoil, Sod And Anchors (Measured In Plan View), Complete In Placesquare yard1—$25.00$25.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Emergency Overflow Swale, 6' Bottom, 6:1 Side Slopes, Topsoil And Sod, Complete In Placelinear foot1—$15.00$15.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Temporary Swales, Side Slopes Per Construction Plans, Complete In Placelinear foot1—$3.00$3.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Proposed Swales, Side Slopes Per Construction Plans, Complete In Placelinear foot1—$3.00$3.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Contractor to remove and dispose offsite 22 lf of existing 24 inch hdpe culvert and boards, and regrade existing maintenance berm, complete in placels1—$250.00$250.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Contractor To Remove Existing Type 'C' Manhole Top And Replace With A Grate Inlet Top At Finished Grade, Complete In Placeeach1—$2,000$2,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Contractor To Remove Existing Brick Plug And Connect Proposed Storm Sewer, All Sizes, Complete In Placeeach1—$200.00$200.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Stage Ii - Reinforced Concrete 15' H-2 Inlet, All Depths, Complete In Placeeach1—$4,000$4,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Stage I - Reinforced Concrete 15' H-2 Inlet, Includes Inlet Protection Barrier For Stage I Inlet, All Depths, Complete In Placeeach1—$4,000$4,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Stage Ii - Reinforced Concrete 10' H-2 Inlet, All Depths, Complete In Placeeach1—$1,100$1,100Nov 3, 2026, Open bid tab, 2791-4112 ↗
Stage I - Reinforced Concrete 10' H-2 Inlet, Includes Inlet Protection Barrier For Stage I Inlet, All Depths, Complete In Placeeach1—$3,000$3,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Stage ii - standard 5' precast inlet ("h-2 inch), all depths, complete in placeeach1—$1,000$1,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Stage i - standard 5' precast inlet ("h-2 inch), all depths, includes inlet protection barrier for stage i inlet, complete in placeeach1—$2,000$2,000Nov 3, 2026, Open bid tab, 2791-4112 ↗
Dewatering, All Sizes And Depths, For Sanitary Sewer Construction (To Be Used Only At The Written Direction Of The Engineer), Complete In Placelinear foot1—$20.00$20.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Standard 6” Sanitary Sewer Stack, All Depths, Complete In Placeeach1—$500.00$500.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Short side double or single 6 inch pvc pipe service lead, astm d-2241, sdr 26, includes pipe, tie-in to existing sanitary sewer, cement stabilized sand backfill, riser, wye, plug, marker, and any necessary fitting, all depths, complete in placeeach1—$990.00$990.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Short side double or single 6 inch pvc pipe service lead, astm d-2241, sdr 26, includes pipe, cement stabilized sand backfill, riser, wye, plug, marker, and any necessary fitting, all depths, complete in placeeach1—$1,160$1,160Nov 3, 2026, Open bid tab, 2791-4112 ↗
Long side double or single 6 inch pvc pipe service lead, astm d-2241, sdr 26, includes pipe, cement stabilized sand backfill, riser, wye, plug, marker, and any necessary fitting, all depths, complete in placelinear foot1—$39.00$39.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Dewatering Per Linear Foot Of Water Line Construction, All Sizes And Depths, For Water Line Construction (To Be Used Only At The Written Direction Of The Engineer) (No Additional Compensation For Multiple Rows), Complete In Placelinear foot1—$10.00$10.00Nov 3, 2026, Open bid tab, 2791-4112 ↗
Trenchless construction for pvc casing for 8 inch water line, does not include carrier pipe, includes excavation and backfill of bore pits, complete in placelinear foot1—$45.00$45.00Nov 3, 2026, Open bid tab, 2791-4112 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Texas: statewide figures.