Construction unit costs in Virginia

Median awarded unit prices for the 37 most-bid items on Virginia public projects, from winning bids in agency bid tabulations.

Cost by state › Virginia

ItemPerMedianMiddle halfWinning bids
Flagger Servicehour$36.00$30.00 – $47.03611
Type B Class I Pvmt Line Mrkg 4"linear foot$1.10$0.85 – $1.90426
Temp. Pvmt Mrkg, TY. A, 4"linear foot$0.16$0.09 – $0.24414
Type B Class I Pvmt Line Mrkg 6"linear foot$1.44$1.00 – $2.65347
Type B Class I Pvmt Line Mrkg 24"linear foot$15.00$10.85 – $22.00338
Inlaid Pavement Marker Asphalteach$51.75$39.95 – $85.36318
Truck Mounted Attenuatorhour$30.00$13.38 – $57.66276
Port.Changeable Mess. Signhour$9.00$4.88 – $14.00267
Agr.Base Mat.Ty.I or II NO. 21A OR21Bton$60.00$45.00 – $75.00256
Temp. Silt Fence Type Alinear foot$5.78$3.50 – $8.74228
Pvmt Symb Mrkg SGL Turn Arr. TY B CL Ieach$161.15$135.00 – $204.25228
Temp. Pvmt Mrkg, TY. A, 6"linear foot$0.21$0.1 – $0.415227
Eradicate Nonlinear Pvmt Mrkgsquare foot$10.00$6.51 – $16.15226
Temp. Pvmt Mrkg TY. A, 12"linear foot$2.00$0.607 – $3.00224
Temporary Signsquare foot$33.15$24.00 – $45.00214
Type B Class II Pvmt Line Mrkg 24"linear foot$30.00$22.01 – $45.00214
Rumble Strip Cylindrical Asphaltlinear foot$0.6$0.345 – $1.27195
Sign Panelsquare foot$50.00$39.95 – $64.00189
Regular Seedpound$16.38$8.98 – $22.10174
Limeton$350.00$200.00 – $500.00172
Fertilizer Nitrogen - Npound$3.98$2.29 – $6.78172
Fertilizer Potassium - Kpound$4.00$2.30 – $6.64172
Fertilizer Phosphorous - Ppound$3.96$2.30 – $6.64172
Overseedingpound$15.00$7.26 – $21.57168
Type A Pvmt Line Mrkg 4"linear foot$0.38$0.3 – $0.7162
Temporary Seedpound$16.23$11.54 – $20.00159
Inlet Protection Type Aeach$388.22$249.17 – $601.50155
Sign Post STP-1, 2", 14 Gaugelinear foot$28.00$22.49 – $41.05152
Regular Excavationcubic yard$85.00$51.09 – $142.31142
Hydraulic Erosion Control Product Type 3square yard$1.35$1.10 – $2.50142
Remove Existing Guardraillinear foot$8.50$5.00 – $11.12136
Aggr. Base Matl. TY. I NO. 21Bton$68.00$50.00 – $90.00130
Borrow Excavationcubic yard$56.00$35.00 – $85.00121
Flowable Backfillcubic yard$545.88$360.19 – $750.0079
Structure Excavationcubic yard$56.00$35.00 – $85.0037
Clearing AND Grubbingacre$39,756$22,800 – $75,00029
Geotextile Fabricsquare yard$6.15$3.45 – $9.0628