Construction unit costs in Montana
Median awarded unit prices for the 45 most-bid items on Montana public projects, from winning bids in agency bid tabulations.
| Item | Per | Median | Middle half | Winning bids |
|---|---|---|---|---|
| Striping-white Epoxy | gallon | $136.00 | $116.25 – $197.50 | 154 |
| Striping-yellow Epoxy | gallon | $135.00 | $116.25 – $185.98 | 150 |
| Striping-white Paint | gallon | $50.00 | $41.75 – $100.00 | 140 |
| Striping-yellow Paint | gallon | $50.00 | $41.25 – $88.75 | 138 |
| Emulsified Asphalt-tack Coat | gallon | $5.00 | $3.35 – $10.00 | 136 |
| Signs-alum Refl Sheet XI | square foot | $44.75 | $40.00 – $50.00 | 136 |
| Remove Sign | each | $75.00 | $50.75 – $100.00 | 131 |
| Words and Symbols-white Epoxy | gallon | $365.00 | $350.00 – $400.62 | 128 |
| Words and Symbols-white Paint | gallon | $252.50 | $250.00 – $275.00 | 112 |
| Crushed Aggregate Course | cubic yard | $77.50 | $52.00 – $124.50 | 110 |
| Emulsified Asphalt CHFRS-2P | ton | $905.50 | $849.75 – $1,012 | 108 |
| Cold Milling | square yard | $3.50 | $2.00 – $9.00 | 101 |
| Temporary Striping | linear foot | $0.25 | $0.25 – $0.5 | 89 |
| Test Trailer-transport,Setup | mile | $30.00 | $11.00 – $50.00 | 87 |
| Posts-steel U Sign | pound | $9.38 | $8.00 – $12.00 | 86 |
| Signs-alum Sheet Incr XI | square foot | $46.00 | $41.12 – $51.00 | 86 |
| Poles-treated Wood 4 in | linear foot | $16.00 | $15.00 – $20.00 | 85 |
| Poles-treated Wood 5 in | linear foot | $17.00 | $16.00 – $20.00 | 78 |
| Remove Sign-guide | each | $326.35 | $250.00 – $435.00 | 76 |
| Cover-type 1 | square yard | $1.02 | $0.825 – $1.50 | 72 |
| Motorcycle Advisory Sign | each | $1,850 | $1,500 – $2,125 | 72 |
| Portable Variable Message Sign | each | $8,000 | $5,781 – $10,000 | 70 |
| Remove Guardrail | linear foot | $4.90 | $4.00 – $6.00 | 69 |
| Rumble Strips | mile | $1,200 | $850.00 – $1,600 | 65 |
| Hydrated Lime | ton | $310.00 | $292.00 – $349.00 | 62 |
| Mash W-beam Terminal Section | each | $3,850 | $3,600 – $4,483 | 62 |
| MGS Guardrail | linear foot | $35.00 | $30.19 – $40.00 | 58 |
| Excavation-unclassified | cubic yard | $25.00 | $11.06 – $42.00 | 57 |
| Curb Marking-yellow Epoxy | gallon | $370.00 | $350.00 – $400.00 | 55 |
| Aggregate Treatment | square yard | $1.00 | $0.705 – $2.00 | 54 |
| Bridge Deck Crack Seal | square yard | $15.00 | $13.00 – $20.00 | 53 |
| Posts-steel Structural Sign | pound | $8.00 | $6.00 – $11.62 | 48 |
| Geotextile, Stabilization | square yard | $3.00 | $2.25 – $4.76 | 47 |
| Remove Pipe Culvert | linear foot | $40.00 | $30.00 – $65.14 | 46 |
| Cover-type 2 | square yard | $1.17 | $0.93 – $2.00 | 43 |
| Words and Symbols-yellow Epoxy | gallon | $370.00 | $350.00 – $400.00 | 41 |
| Emulsified Asphalt-fog Seal | gallon | $5.50 | $5.08 – $7.00 | 39 |
| Temporary Impact Attenuator | each | $3,500 | $2,900 – $4,400 | 37 |
| Topsoil-salvaging and Placing | cubic yard | $8.00 | $5.98 – $13.25 | 36 |
| Reinforcing Steel (Epoxy Coated) | pound | $2.90 | $2.54 – $3.21 | 24 |
| Reinforcing Steel | pound | $2.83 | $2.50 – $3.79 | 22 |
| Embankment in Place | cubic yard | $33.00 | $16.74 – $55.00 | 15 |
| Delineator DES a | each | $39.00 | $36.00 – $47.50 | 15 |
| Delineator DES D | each | $43.50 | $38.31 – $45.38 | 14 |
| Remove Bituminous Pavement | square yard | $20.00 | $10.20 – $36.25 | 12 |
Agencies in Montana
- MDT: 25,844 winning prices