ItemPerMedianMiddle halfWinning bids
Flagger (Set Price)hour$30.00$30.00 – $30.00998
Pavement Marking (Multi-component) (White) (6")linear foot$0.6$0.51 – $0.75498
Pavement Marking Removallinear foot$0.5$0.25 – $0.75452
Pavement Marking (Multi-component) (Yellow) (4")linear foot$0.42$0.4 – $0.54436
Water (Erosion Control) (Set Price)thousand gallons$40.00$40.00 – $40.00360
Reinforcing Steel (Grade 60)pound$1.50$1.10 – $2.10359
Sediment Removal (Set Price)cubic yard$50.00$50.00 – $50.00354
Temporary Berm (Set Price)linear foot$2.00$2.00 – $2.00353
Quality Control Testing (HMA)ton$1.85$1.25 – $2.24336
Water (Grading) (Set Price)thousand gallons$40.00$40.00 – $40.00335
Soil Erosion MIXpound$24.00$15.53 – $44.75298
Hma-commercial Grade (Class A)ton$153.00$120.00 – $207.90297
Rock Excavationcubic yard$48.27$28.08 – $100.00296
Asphalt Core (Set Price)each$50.00$50.00 – $50.00294
Reinforcing Steel (Grade 60) (Epoxy Coated)pound$1.70$1.50 – $2.35294
Material for HMA Patching (Set Price)ton$250.00$250.00 – $250.00273
Pavement Edge Wedge (Rock)ton$50.00$40.98 – $64.00260
Erosion Control (Class 1) (Type C)square yard$2.73$2.14 – $3.75260
Emulsified Asphalt (SS-1HP)ton$700.00$675.00 – $725.00259
Pavement Marking (Intersection Grade) (White) (24")linear foot$20.00$14.00 – $25.00248
Bridge Backwall Protection Systemsquare yard$40.00$30.00 – $50.00238
Water (Earthwork Compaction) (Set Price)thousand gallons$40.00$40.00 – $40.00235
Foundation Stabilization (Set Price)cubic yard$40.00$40.00 – $40.00231
Common Excavation (Rural Small)cubic yard$12.00$7.00 – $25.00224
Concrete (Grade 4.0) (Ae)cubic yard$1,121$885.16 – $1,365222
Sign (Flat Sheet) (High Performance)square foot$25.00$20.88 – $35.00220
Common Excavation (Contractor Furnished)cubic yard$23.00$13.00 – $48.00217
Millington$16.00$12.02 – $24.00215
Slope Protection (Riprap Stone)cubic yard$106.89$89.00 – $130.00207
Swppp Inspectioneach$215.00$170.00 – $300.00205
Water Pollution Control Managereach$200.00$150.00 – $275.00205
Concrete for Seal Course (Set Price)cubic yard$225.00$225.00 – $225.00203
Silt Fencelinear foot$2.63$2.00 – $3.85201
Temporary Surfacing Material (Aggregate) (Set Price)cubic yard$50.00$50.00 – $50.00194
Water (Aggregate Base) (Set Price)thousand gallons$40.00$40.00 – $40.00185
Rumble Strips (Milled) (Asphalt)station$13.62$8.81 – $19.26182
Rumble Strips (Milled) (Asphalt) (Centerline)station$14.00$9.00 – $18.66175
Compaction of Earthwork (Type A) (MR-5-5)cubic yard$2.50$1.50 – $7.38174
Salvaged Topsoilsquare yard$2.00$0.927 – $4.28166
Biodegradable Log (20")linear foot$7.00$6.00 – $10.00156
Geotextile (Erosion Control)square yard$4.12$3.00 – $5.12140
Geotextile Fabricsquare yard$5.00$3.32 – $8.0068
Monument Boxeach$2,000$1,600 – $2,70419
Cementton$246.70$236.00 – $272.3716
Limeton$325.36$322.16 – $370.0012